Ремонт техники Специалисты Строительство и ремонт Другое Страны

Underfloor heating master in Bishkek

Underfloor heating Bishkek

We calculate per m², not "by eye": installation from 290 som, visit and diagnostics free, 2-year warranty on all work.

Installation in 1 day
1000 m² experience
Measurement within 24 h
Examples of work — underfloor heating
Adilet Kadyrov
Heating engineer
4.9
Types of services

Our warm floor services in Bishkek

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Cable laying
We lay single-core and twin-core cable in a snake pattern with a pitch for tile or laminate, and fasten it to mounting tape
Дверная москитная сетка
Section installation
We roll out the finished section over the area, fix it with fasteners, and lead the cold end to the socket box
Сетка Плиссе
IR film laying
We lay the infrared film in strips, insulate the edges, and connect the contacts in parallel
Антикошка PetScreen
Mat installation
We roll out the mat with the mesh down, trim it for niches, and route around pipes and risers
Антипыль Micro Mesh
Thermostat installation
We install the programmable device in the socket box, connect the load and sensor, and configure the modes
Нестандартная москитная сетка
Sensor connection
We run the remote sensor into the corrugated tube between the coils, check the resistance, and lead it out to the regulator
Раздвижная москитная сетка
Water floor installation
We assemble the water circuit from pipes, lay it out across the rooms, and lead it to the manifold
Магнитная рамка
Pipe laying
We lay the pipes in loops with the required pitch, fasten them to the mesh, and lead the ends to the manifold
Сетка-штора на магнитах
Manifold assembly
We assemble the manifold with flow meters and air vents, connect the loops, and pressure-test
Pricing

Prices for underfloor heating installation in Bishkek

Price depends on window size and mesh type. Exact price — after free measurement

Service type Description Price Warranty
Laying of the heating cable Electric, under tiles от 390 сом 2 years
Installation of the heating section Electric, on screed от 450 сом 2 years
Laying of infrared film Film, under laminate от 490 сом 2 years
Installation of underfloor heating mat Electric, thin от 550 сом 2 years
Thermostat installation Setup and connection от 590 сом 2 years
Connection of the temperature sensor Laying in corrugated conduit от 350 сом 2 years
Installation of water underfloor heating Pipes, manifold от 900 сом 2 years
Laying of underfloor heating pipes Loop spacing, fastening от 690 сом 2 years
Installation of the manifold unit Distribution of loops от 890 сом 2 years
Pressure testing of the underfloor heating system Pressure check от 650 сом 2 years
Pouring screed for underfloor heating Semi-dry, leveling от 900 сом 2 years
Installation of thermal insulation under the floor Polystyrene, foil от 750 сом 2 years
Laying of the damping tape Along the perimeter of the walls от 290 сом 2 years
Installation of reinforcing mesh Fixing of pipes and cable от 790 сом 2 years
Commissioning of the heated floor First start-up, warm-up от 990 сом 2 years
Repair of the heating cable Break detection, replacement от 900 сом 2 years
Thermostat replacement Dismantling and installation от 850 сом 2 years
Diagnostics of the heated floor Fault detection бесплатно 2 years
Repair of the water circuit Leak repair от 1 500 сом 2 years
Balancing of loops Flow rate adjustment от 950 сом 2 years
Connecting underfloor heating to the boiler Piping, commissioning от 900 сом 2 years
Installation of heated floor under tiles Cable, screed, laying от 900 сом 2 years
Laying underfloor heating over a large area From 20 m², turnkey от 900 сом 2 years
Setting up a programmable thermostat Wi-Fi, schedule от 900 сом 2 years
Replacement of the floor temperature sensor Dismantling, installation от 900 сом 2 years
Repair of the manifold unit Replacement of valves, fittings от 900 сом 2 years
Flushing of heated floor circuits Removal of deposits от 900 сом 2 years
Installation of underfloor heating in the bathroom Cable, waterproofing от 900 сом 2 years
Laying of heated floor on the balcony Film, insulation от 900 сом 2 years
Connecting underfloor heating to the power grid Separate line, circuit breaker от 900 сом 2 years
Why Us

Our advantages in warm floors

High-quality mosquito nets with turnkey installation

2-year warranty on installation

Written contract and 2-year warranty on work and materials: in case of a leak or thermostat failure, a craftsman's visit and troubleshooting under warranty.

Installation in 1 day

A team of 3 installers lays underfloor heating on an area of up to 60 m² in 1 working day: the screed dries separately, but the system is ready to start immediately.

Experience over 10 years

12 years of experience and over 1000 m² of installed underfloor heating in Bishkek: we know how screed and pipes behave under local temperature fluctuations.

Measurement within 24 hours

The surveyor arrives within 24 hours after the request, performs a heating engineering calculation and a laying plan in 3 hours — you see the plan before work begins.

10% discount on volume

When ordering from 80 m², a 10% discount applies: the larger the area, the lower the unit cost of work per square meter.

Turnkey underfloor heating

Full cycle: dismantling the old covering, laying the circuit, screed, connecting the thermostat and commissioning — 5 stages without subcontractors.

Laying plan in 3 hours

The designer prepares the circuit layout plan in 3 hours: we take into account furniture, windows and unheated zones so as not to heat the air under a cabinet.

Materials with a 2-year warranty

We work with certified pipes and cable: 2-year warranty on materials, replacement of a defective circuit at no extra cost to you.

Process

Order stages

Прозрачный процесс от заявки до установки — всё просто и быстро

01

Request and consultation

We accept the request, clarify the type of premises, area and floor covering. We select a solution for the task and agree on a convenient time.

02

On-site diagnostics

The craftsman arrives with equipment, checks the thermostat, cable and sensor. We find the cause: break, short circuit, damage during installation.

03

Approval of work

We explain the diagnostic result in simple words, offer options for repair or replacement. The cost is calculated after diagnostics, without imposed services.

04

Repair or replacement

We restore the circuit, replace the section, sensor or thermostat. We use proven materials and follow the laying and connection technology.

05

Check and start-up

We warm up the system, measure resistance and current, adjust the thermostat. We make sure the heating is uniform across the entire area.

06

Warranty and support

We give a 2-year warranty on work and installed parts. We stay in touch: we will help with setup and answer questions about operation.

Team

Our warm floor specialists

Certified measurement and installation specialists

Абдиев Нурлан

Abdiev Nurlan

Hydrodynamic machine operator

14 years of experience
201 reviews 4.9
Асанов Тимур

Asanov Timur

Blockage removal specialist

15 years of experience
186 reviews 4.7
Смирнова Елена

Smirnova Elena

Emergency service dispatcher

14 years of experience
146 reviews 4.7
Бекмурзаев Азамат

Bekmurzaev Azamat

Pipe TV inspection specialist

14 years of experience
70 reviews 4.7
Жумабеков Данияр

Zhumabekov Daniyar

Sludge suction machine operator

14 years of experience
168 reviews 4.9
Кузнецова Ольга

Kuznetsova Olga

Coordinator of field teams

16 years of experience
108 reviews 4.9
Ибраимов Руслан

Ibraimov Ruslan

Emergency service plumber

7 years of experience
93 reviews 4.8
Сыдыков Эрлан

Sydykov Erlan

Request intake manager

17 years of experience
86 reviews 4.9
Cases

Warm floor cases

Real examples of installed mosquito nets

Установка рамочной сетки
Replacement of a burnt-out warm floor thermostat
850 som
2 year warranty
Problem
The thermostat does not turn on, there is no indication, the warm floor does not heat
Diagnostics
Inspection revealed burnout of the power relay and scorching of the terminals on the thermostat
Solution
The old thermostat was dismantled, a new one was installed, and the operation of the sensor and heating section was checked
Абдиев Нурлан
Abdiev Nurlan
Hydrodynamic machine operator
4.9
Установка дверной сетки
Repair of a broken heating cable
900 som
2 year warranty
Problem
After the repair, part of the underfloor heating in the room stopped heating
Diagnostics
During continuity testing, a break in the heating cable was found at the point of damage to the screed
Solution
The screed was opened, the cable integrity was restored with a coupling, and the chase was sealed
Асанов Тимур
Asanov Timur
Clog removal specialist
4.8
Установка сетки Антикошка
Installation of a heating cable in the bathroom
390 som
2 year warranty
Problem
Cold floor in the bathroom, the tiles do not warm up, discomfort during use
Diagnostics
There is no heating system, cable laying and connection to the thermostat are required
Solution
The heating cable was laid, the thermostat was installed, and commissioning was performed
Смирнова Елена
Smirnova Elena
Emergency service dispatcher
4.9
Нестандартная сетка
Installation of a thermostat with a temperature sensor
590 som
2 year warranty
Problem
The underfloor heating works without regulation, overheating and high electricity consumption
Diagnostics
Only the heating mat is installed, the thermostat and sensor are missing
Solution
The thermostat was mounted, the temperature sensor was connected, and the operating mode was configured
Бекмурзаев Азамат
Bekmurzaev Azamat
Pipe teleinspection specialist
4.7
Раздвижные сетки
Installation of a water underfloor heating system in the screed
900 som
2 year warranty
Problem
Cold floors on the first floor, major heating of the premises is required
Diagnostics
There is no heating circuit, pipe laying and connection to the boiler are necessary
Solution
Underfloor heating pipes were laid, the screed was made, and the system was connected to the boiler
Жумабеков Данияр
Zhumabekov Daniyar
Sludge suction machine operator
5.0
Сетка Антипыль
Pressure testing and balancing of underfloor heating circuits
650 som
2 year warranty
Problem
Some circuits heat more strongly, others remain cold, uneven warming
Diagnostics
The flow balance between the circuits is disturbed, a leak in the system is possible
Solution
Pressure testing of the system was carried out, and the circuits of the manifold unit were balanced
Кузнецова Ольга
Kuznetsova Olga
Coordinator of field crews
4.9
Перетяжка полотна
Installation of a manifold unit for underfloor heating
890 som
2 year warranty
Problem
It is impossible to regulate the temperature by room, the circuits are connected directly
Diagnostics
There is no distribution unit, installation of a manifold with flow meters is required
Solution
The manifold unit was mounted, the circuits were connected, and commissioning was performed
Абдиев Нурлан
Abdiev Nurlan
Hydrodynamic machine operator
4.8
Сетка Плиссе
Laying of infrared film under the laminate
490 som
2 year warranty
Problem
The floor is cold, quick heating is required without pouring a screed
Diagnostics
The base is level, it is possible to lay a film underfloor heating under the finishing coating
Solution
The infrared film was laid, the thermostat was connected, and the laminate was laid
Асанов Тимур
Asanov Timur
Clog removal specialist
5.0

Heated floor in Bishkek from Eco-Service: types of systems, calculation and turnkey installation

What underfloor heating systems Eco-Service installs in Bishkek

We install four electric subsystems and a water circuit. The choice depends on the finish flooring, the heating area and the heat source in the house — we break down each option separately.

Electric heating: cable, section, mat, infrared film

  • Heating cable: single-core or twin-core wire into the screed; we select the laying pitch for the power per square meter, and cut only at the factory markings.
  • Heating section: a ready-made length of cable with a coupling and cold lead — convenient for bathrooms and small kitchens, where an exact footage matters.
  • Mat: a thin cable on a fiberglass mesh, rolled out in a roll; the floor build-up grows by 3-5 cm, so the mat is used under tiles and porcelain stoneware.
  • Infrared film: a lay-on option under laminate and parquet board, it does not raise the floor level and does not require a wet screed — installation takes one day.

Water circuit: manifold, connection to the boiler

In Bishkek we assemble the water system from PEX or metal-plastic pipes, a manifold unit, and connect it to a gas boiler. We lay the circuit in a serpentine or spiral pattern with a pitch of 150-200 mm, and we mount the manifold on a comb with flow meters so that each circuit can be adjusted separately. We make the connection to the boiler through a mixing unit with a three-way valve — it keeps the supply temperature within 35-45 °C, otherwise the screed cracks. In a private house near Bishkek, where a gas boiler is already installed, a water circuit is worthwhile for an area of 40 m² or more, while in a khrushchevka with a thin screed, electric is more often chosen. At Eco-Service, on sites with a boiler, we usually advise first calculating the house's heat losses and then deciding on the circuit — otherwise the manifold is selected at random. Clients often ask about warm water underfloor heating price per m2 — but the total depends on the circuit footage, the laying pitch and the screed thickness, not on a single figure.

Comparison of systems: what to choose for the flooring and area

System For which flooring Floor build-up Where it is appropriate
Heating cable Tiles, porcelain stoneware Screed 3-5 cm Bathroom, kitchen, hallway
Heating section Tiles, porcelain stoneware Screed 3-5 cm Small areas up to 6 m²
Underfloor heating mat Tiles, porcelain stoneware Screed 3-5 cm Bathroom, balcony, loggia
Infrared film Laminate, parquet board No screed, 0.5 cm Bedroom, children's room, study
Water circuit Any, most often tiles Screed 5-8 cm House from 40 m² with a boiler

The choice of system is determined by the finish flooring, the heating area and the presence of a boiler: a mat in the screed adds 3-5 cm, film under laminate — 0.5 cm. If you need an underfloor heating system under tiles over a large area, a water circuit with a boiler more often wins; under laminate in a bedroom — film without wet work. In our orders for a bathroom up to 6 m², a mat or section is almost always cheaper to install than running a circuit from the boiler. Many clients search for underfloor heating price m2 — but it is only correct to compare options by the finished build-up, not by the meter of the heater. In my opinion, for a house with a boiler and an area of 40 m² or more, a water circuit pays off faster, while in an apartment with a thin screed, electric is simpler and more predictable in terms of timelines.

What to consider before choosing a system

The cost per square meter depends not only on the type of heater, but also on the thickness of the insulation, the laying spacing, and the complexity of the wiring. We calculate the estimate after taking measurements: we look at ceiling height, the material of the floor slab, whether there is a boiler, and the finishing floor covering. Clients search for underfloor heating cost of work and underfloor heating price — but there is no universal figure here: 4 m² in a bathroom and 80 m² in a private house are two different projects with different logistics. Likewise, clients often enter underfloor heating calculation into search as a single line — and land on this page, although behind that phrase lies a whole sequence: heat loss, power per square meter, laying spacing, choice of heater. People often type underfloor heating price into the search bar — and through that phrase they come to us for a measurement, because the final total is still calculated per property. Such systems in Bishkek are a seasonal story: there are more requests in autumn, so allow 5-7 days for installation and commissioning. Check the cost after measurement, not over the phone — the variation between properties is too great. The price per m2 when converted to a finished system is always higher than the price of one meter of heater: insulation, edge insulation tape, reinforcing mesh, and labor are added.

Underfloor heating calculation: power, installation spacing, material consumption

The calculation starts not with the room's area, but with the building's heat losses. Before installation, we calculate the power per square meter, the installation spacing, and material consumption — these figures determine whether the system will reach its operating mode or will only heat at half strength.

How to calculate power and installation spacing

We base the power calculation on heat losses: for residential rooms in Bishkek we take 120-150 W/m², for bathrooms and balconies — up to 180 W/m². These figures are influenced by wall thickness, the quality of the glazing, the floor, and whether the ceiling slab is insulated — a panel nine-story building in the Jalal microdistrict loses heat differently than a brick house in the center. The installation spacing of the heating cable is directly related to power: halve the spacing — double the watts per square meter. That's why you can't lay it out "by eye" — you'll end up either with overheating and a risk of insulation breakdown, or with underheating and cold zones near the windows. Eco-Service calculates power and installation spacing based on the room plan, taking furniture placement into account. Clients often find us with the query "underfloor heating Bishkek" — and through it they land on the page with this calculation. In my opinion, an honest heat calculation saves more than any savings on cable: redoing the screed will cost more.

What is included in the underfloor heating calculation per 1 m2

  • System power: watts per square meter for the specific room — from 120 W/m² for a bedroom to 180 W/m² for a bathroom.
  • Length of heating cable or pipe: calculated from the usable area minus the zones under furniture and appliances.
  • Installation spacing: for cable — 8-12 cm, for the pipe of a water circuit — 15-20 cm with tighter spacing near exterior walls.
  • Underfloor thermal insulation: expanded polystyrene or a foil mat; the thickness depends on whether the room below is heated.
  • Edge insulation tape and reinforcing mesh: they compensate for screed expansion and hold the circuit; consumption is calculated along the perimeter and by area, respectively.

Electricity consumption and time to reach operating mode

Electric heating in Bishkek consumes on average 0.1-0.15 kWh per m² per hour of operation, and reaches its operating mode in 20-40 minutes. The range depends on the screed thickness: under 5 cm tile, warm-up starts faster than under 8 cm porcelain stoneware. A programmable thermostat reduces consumption more noticeably than changing the system: nighttime heating on a two-rate meter is cheaper, and the screed retains heat for 2-3 hours after switching off. Eco-Service installs thermostats and temperature sensors — programmable models pay for themselves within a single heating season. In our practice, a 45 m² apartment with a sensor in the screed and a nighttime mode consumes less than the same area without automation. Place the sensor in the coldest zone — by a window or the entrance door, not in the center of the room.

What makes up the calculation per 1 m2 and the overall project budget

In an estimate, an underfloor heating system breaks down into three variables: the type of circuit, the installation area, and the thickness of the layers. An electric cable for 12 m² will cost less than a water circuit for the same area, but a water circuit is more economical in operation for permanent residence. The water circuit has a higher price per m2 because of the manifold unit, the pump mixing unit, and the connection to the boiler — these items are not divided by meters, but calculated per project. The cost of work also depends on complexity: installation on a level slab is one scenario, installation on the ground with pouring a rough screed is another. Clients enter "underfloor heating cost" and "cost of underfloor heating per square meter," and in the estimate they see a breakdown into materials and labor. The queries "underfloor heating price per m2" and "underfloor heating price per square meter" bring us those who are comparing the project budget. Another frequent input is underfloor heating system price: this is how those who need a reference point for the whole kit, rather than for an individual item, search. You shouldn't skimp on thermal insulation: the centimeters saved on the underlay will come back as heating bills.

Underfloor heating installation in Bishkek: work stages from the base to commissioning

Installation follows strict stages: base preparation, thermal insulation, laying the heating element, connecting the automation, pressure testing, screeding and commissioning. The order must not be broken — each subsequent step relies on the quality of the previous one.

Base preparation, thermal insulation and edge insulation strip

  • Base leveling: the level deviation must not exceed 5 mm per 2 meters — otherwise the heating element will lie with gaps and overheat.
  • Underfloor thermal insulation installation: Eco-Service employees lay extruded polystyrene foam 30-50 mm thick, with a foil layer on top and joints sealed with aluminum tape.
  • Laying the edge insulation strip: we fix it along the perimeter of walls and around columns; it absorbs the thermal expansion of the screed during the first heating.
  • Fixing the screed guides: we set them to the level of the future screed so that the thickness above the heating element is uniform across the entire area.

Laying the cable, mat or pipe: spacing and fastening

We lay the heating cable, mat or pipe at the calculated spacing with fastening to the reinforcing mesh. The spacing is set by the system calculation: for cable it is 8-12 cm in areas of constant occupancy and 15-20 cm near furniture, for a water circuit — 15-20 cm, reduced to 10 cm along external walls and glazing. The mat is laid as a ready-made section with a fixed spacing; it is enough to roll it out and secure it. We fix pipes to the mesh with plastic clips or a mounting rail with a fastening spacing of 30-40 cm, and at bends we maintain a radius of at least five diameters. The cable must not be laid flush against itself or cross itself — at crossing points local overheating and insulation breakdown occur.

Connecting the thermostat, sensor and circuit breaker

  • Thermostat: we install it in a wall box at a height of 1.2-1.5 m from the floor, outside the heating zone and away from heat sources — oven, radiator, sunny side.
  • Temperature sensor: we run it into a corrugated conduit in the heating zone between the cable turns, and seal the end of the conduit so that moisture does not get into the screed.
  • Circuit breaker and RCD: we install a separate breaker rated for the power on the heating line and a 30 mA RCD — leakage protection is mandatory for wet areas.
  • Power cable: we run copper with a cross-section of 2.5 mm² for a line up to 3.5 kW; connections are made only in the wall box, there are no twists in the screed.

Pressure testing, screeding and system commissioning

Before screeding we pressure-test the system, pour the screed and start it up after drying. We pressure-test the water circuit at one and a half times the working pressure and hold it for a day — a pressure drop reveals leaks before the circuit is encased in concrete. We pour the screed with cement-sand mortar or a semi-dry mix to a thickness of 40-60 mm above the pipe, and observe the screed drying time: 7 days for each centimeter at normal humidity and temperature. In search, clients often type "underfloor heating Bishkek" — that is how they find our installation and order turnkey commissioning. Commissioning includes a gradual ramp-up to operating mode in steps of 5 °C per day — this way the concrete gains strength without thermal shock. Turning on the heating in a fresh screed is not allowed: if heating is started immediately, cracks will form and tear the tiles off.

Balancing the water underfloor heating circuits

We balance the circuits at the manifold unit, equalizing the coolant flow rate along the length of each loop. We assemble the manifold unit with flow meters on the supply and balancing valves on the return: the flow meters show the actual flow through each loop, and we adjust it with the valves. The difference in loop lengths within one system must not exceed 20% — otherwise the short loop takes most of the coolant. We connect to the boiler through a mixing unit with a three-way valve so that the temperature in the circuit does not exceed 45 °C. Without balancing, the circuit closest to the boiler takes most of the heat — the far room stays cold even though the system is running.

What is included in the cost of underfloor heating and how the estimate is calculated

The estimate is made up of the scope of installation work and the consumption of materials for a specific area. For specific rates, see the price list on this page — here we'll explain the logic of the calculation.

What makes up the cost of underfloor heating per m2

  • Type of system: electric cable, section, mat, infrared film or water circuit — each has its own materials and labor intensity of installation.
  • Scope of work: base preparation, thermal insulation, edge insulation tape, reinforcing mesh, laying the heating element, screed, connection, commissioning.
  • The price of underfloor heating per square meter increases with the thickness of the layer cake: on soil or above an unheated basement, a reinforced layer of insulation is needed; on a floor slab between heated floors — a lightweight one.
  • Laying spacing and power calculation: for 15 m² in a bedroom and 15 m² in a kitchen with floor-to-ceiling windows, the cable spacing differs, which means the length of the heater also differs.
  • Material consumption per area: the more square meters, the higher the total consumption, but the share of preparatory operations per meter decreases.

Cost of installation work: what is included in the service

  • Laying the heating cable or pipe: laying out at the calculated spacing, fastening to the mounting tape or mesh, bringing the cold leads out to the thermostat.
  • Installation of the thermostat and sensor: mounting the back box, connecting the temperature sensor in the conduit, running the power cable to the circuit breaker.
  • Pressure testing of the system: checking the water circuit under pressure before pouring the screed, with the result recorded in a report.
  • Pouring the screed for underfloor heating: maintaining the thickness above the heating element, reinforcement, monitoring strength gain before the first start-up.
  • Commissioning: running through the modes, setting the thermostat program, balancing the water floor circuits using the flow meters.

Cost of water underfloor heating per m2 and what it depends on

The cost of water underfloor heating per m2 depends on the length of the circuits, the type of pipes, the manifold unit and whether the system needs to be connected to a boiler. In new buildings in Bishkek with a gas boiler, one configuration applies; in older housing stock with central heating, another — there, a pump mixing unit and a separate manifold cabinet are more often installed. The length of the circuit is affected by the geometry of the room: in a narrow galley kitchen, pipes are laid in a serpentine pattern with a smaller spacing; in a spacious living room — in a spiral, and the pipe consumption for the same 20 m² differs by one and a half times. A manifold unit with flow meters and balancing valves adds several line items to the estimate, but it allows you to even out the temperature across rooms without rework. Connecting to the boiler requires a separate branch in the piping: if the boiler is already at its limit, a hydraulic separator is added. Clients often search for "underfloor heating cost m2" — and land on this page, although for a water circuit what matters more is not the square meterage but the pipe length and the number of circuits. The search query "price of underfloor heating per square meter" also appears — it shows that the person has not yet decided on the type of system and is comparing options by area. The cost of the water type is higher at the start, but for areas from 60 m², operation turns out cheaper — count not only the installation, but also the annual consumption.

How the estimate is calculated per project: turnkey cost

The cost and timelines are not determined by a template, but after a site measurement: the specialist records the area of each room, the type of flooring, the ceiling height and the connection point. Two apartments of the same area produce different estimates: the laying spacing, the thickness of the screed and whether underfloor thermal insulation is needed all have an effect — that is why the calculation is done per project. An underfloor heating system in a new building in Bishkek without a screed requires one set of works, while in an apartment with a finished floor covering it requires dismantling and a new layer cake. The calculation includes the layout by room, the selection of the thermostat and circuit breaker, and the price per m2 varies depending on the floor and the presence of a balcony. It is convenient to assemble the estimate in three blocks: rough works, materials, commissioning with a 2-year warranty. Request the calculation before starting work — changes to the design at the measurement stage are free, while rework after the screed costs more.

Warranty, timelines and service: how Eco-Service manages a project after handover

The warranty on installation is 2 years, timelines depend on the type of system, and maintenance is handled by our own service center in Bishkek. Let's break down how a project proceeds after handover and where to turn if something fails.

Warranty on underfloor heating installation — 2 years

Eco-Service provides a 2-year warranty on underfloor heating installation — covering laying, connection and commissioning. The warranty period covers the crew's work: fastening the cable or pipe, assembling the manifold unit, installing the thermostat and temperature sensor, pressure testing and startup. If a project has a system from another contractor, we also take on diagnostics, but the warranty applies only to the work we performed. The warranty is valid provided the operating regime is observed: overheating due to independently reconfiguring the thermostat is a common cause of failures, which is visible from the sensor. Before changing the setpoints, check the system's data sheet — a temperature spike above the design value shortens the service life of the cable and pipe several times over. Clients often find us with the query "cost of underfloor heating" — and land on this page.

Installation timelines and when the system can be turned on

  • Electric cable or mat: laying and connection in a room of 15-20 m² takes 1-2 days, including pouring a thin screed.
  • Infrared film: installation under laminate or parquet without screed — one working day, and it can be turned on immediately after checking the resistance.
  • Water circuit: laying pipes and the manifold — 2-3 days, then the screed cures for 21-28 days until it reaches strength.
  • Commissioning: the first warm-up and balancing of the circuits — a separate visit after the screed has fully dried.

Repair and maintenance: cable, thermostat, water circuit

Repairing the heating cable, replacing the thermostat and restoring the water circuit are the three main requests we receive. We travel throughout Bishkek, and we start diagnostics with the thermostat and temperature sensor: most "breakdowns" of the system are a failed control unit or sensor, not the cable under the screed. If the problem is in the heating section, we locate the damage with a thermal imager and repair it without fully dismantling the flooring. We check the water circuit with a pressure test: a pressure drop will reveal a leak at the manifold connections or in a pipe joint. Start diagnostics with the control unit — opening up the screed for nothing is more expensive than replacing the thermostat. In requests, people often just write "underfloor heating calculation" — that's how we understand that the person needs a preliminary estimate before the visit.

Our own service center in Bishkek

Eco-Service has its own service center in Bishkek — you can bring equipment here for diagnostics or call a crew out to the site. The installation crew travels to addresses within the city, and we accept thermostats, sensors and manifold units on the test bench. In-person drop-off at the center speeds up diagnostics: the control unit and sensor are checked in minutes, rather than by opening up the floor on site. In messages, clients phrase their request as "underfloor heating cost" or "price of underfloor heating" — and based on such a request we immediately calculate an estimate. The cost per square meter with servicing once every two seasons is lower than emergency repair, and the final price depends on whether only the thermostat is being replaced or a section of cable is being restored. People also specifically ask about "underfloor heating price per m2" and "cost per square meter of underfloor heating" — we provide these figures after measurement. Sometimes a request simply says "underfloor heating 1 m2" — from such a request the technician understands that a calculation for a specific area is needed, and clarifies the room's square footage before the visit.

Typical mistakes when installing underfloor heating and how to avoid them

Most often, three things break the system: the wrong laying spacing, the absence of thermal insulation underneath, and starting it up on a wet screed. Let's go through each scenario — how it manifests itself and what to do so you don't have to redo it.

Why the system heats unevenly

Uneven heating is most often caused by the wrong laying spacing or the absence of loop balancing. When the coils are laid at different intervals, the dense sections overheat while the sparse ones stay cold: the difference across the surface reaches 8-12 degrees, and your foot feels it immediately. In a water circuit, loops of different lengths add to this — the loop closest to the manifold unit runs 40 meters, the farthest one 90, and without flow adjustment the heat goes into the short loop. A normal difference between supply and return on the farthest loop is within a couple of degrees; anything greater indicates an unbalanced system. Balancing the loops evens out the heating across the area: the fittings on the manifold are adjusted so that each loop receives its share of the heat carrier. Start by measuring temperatures by zone with a thermal imager — this shows exactly where a sparse spacing was laid, and corrections are made before pouring, not after. Almost every service call starts with this complaint: underfloor heating Bishkek is a frequent request from those who have already encountered cold zones.

Overheating and breakdown of the heating cable

The cable overheats and breaks through the insulation when it is laid with overlaps or without thermal insulation underneath. Overlapping coils are the most common cause of local overheating: at the point of overlap the temperature rises above the design value, the insulation loses its elasticity and cracks within one or two seasons. The second cause is skimping on the underlay: without a reflective layer, some of the heat escapes into the floor slab, the cable runs at its limit and ages faster. Thermal insulation under the floor protects the cable from overheating and reduces electricity consumption. Before pouring the screed, check the section's resistance with a multimeter and photograph the layout — during repairs this saves hours of searching for the damage. When talking to an installer, clients often switch to numbers and search for underfloor heating Bishkek — and from that wording it's immediately clear that the person wants to compare offers, not understand the layout.

Starting up on a wet screed and cracks in the covering

  • First day: set the thermostat to the minimum setpoint and let the system warm up without load.
  • Second to third day: increase by 5 degrees per day — this way moisture escapes evenly through the entire thickness.
  • Moisture control: before starting up, measure the residual moisture of the screed with a moisture meter, not by eye.
  • Water circuit: supply the heat carrier with a gradual increase — a sharp jump tears the seams and tile joints.

What to check before pouring: an acceptance checklist

  • Section resistance: measure with a multimeter before and after laying — a discrepancy with the data sheet signals damage.
  • Coil spacing: go over the entire area with a tape measure — a 3-4 cm variation isn't noticeable by eye, but it changes the heating.
  • Thermal insulation: check that the reflective layer is laid continuously, without gaps at the walls or at the joints.
  • Fastening: make sure the cable or pipe is held on the mounting tape and won't float up during pouring.
  • Sensor: check the thermosensor sleeve — it should sit in the corrugated tube between the coils, not rest against the reinforcement.

What the estimate shows with typical mistakes

A conversation with an installer about how a system is calculated per 1 m² helps to spot weak points in advance: the wrong spacing and the absence of an underlay are baked in already at the layout stage. When a client asks about the price, an honest contractor first shows the heat calculation and only then the estimate — saving on the underlay will come back as having to break open the screed. When comparing costs across different offers, check whether loop balancing and commissioning are included: these are the items most often left out of cheap estimates. The final cost per m² depends not on the length of cable, but on how many mistakes were avoided at the installation stage. For residents of Bishkek, installation begins not with the price but with the calculation: without it, any estimate is a lottery with a screed redo. In search, people phrase it in different ways: underfloor heating cost — behind this query is the simple question of how much a square meter turnkey will cost.

Conclusion

We've gathered the main things worth keeping in mind before ordering: what the result depends on, where mistakes are most often made, and what to look for in the estimate.

Key takeaways

  • System matched to the covering: mats and cable are laid under tiles, film — under laminate, a water loop — over a large area with a boiler.
  • Calculation based on heat loss: the power and laying spacing determine how evenly the floor heats, not the square footage of the room, and it is these that determine the cost per m².
  • Estimate by scope of work: the price per square meter is made up of material consumption and the list of operations, not a single figure.
  • Warranty and service: a two-year warranty and access to diagnostics after handover matter more than installation speed, and a price without service is a risk.
  • Two mistakes: starting up on a wet screed and laying without thermal insulation negate the entire system, which is why in Bishkek people order with calculation and pressure testing, not "by eye."
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азамат К.
6 окт. 2026
I ordered the installation of a heated floor in Bishkek and was very satisfied. The work was done quickly and with high quality, 2-year warranty.
АС
Айгуль С.
22 сен. 2026
We had underfloor heating installed in the apartment, now it's very comfortable in winter. The cost is calculated after diagnostics, but the result is worth it.
БТ
Бакыт Т.
20 сен. 2026
We had underfloor heating installed in a private house, everything works great. The price depends on the scope of work, but we are satisfied.
ГМ
Гульнара М.
17 сен. 2026
I ordered underfloor heating in the bathroom, the masters arrived on time, everything was done neatly. 2-year warranty, I recommend!
ДА
Данияр А.
1 сен. 2026
The underfloor heating installation went smoothly, a team of professionals. The cost is calculated after diagnostics, but we were satisfied.
ЖБ
Жанара Б.
23 июл. 2026
Very pleased with the underfloor heating, installed quickly and cleanly. The price depends on the scope of work, but the result exceeded expectations.
ИВ
Игорь В.
20 июл. 2026
Ordered underfloor heating in a new building, everything was done on time. 2-year warranty, I will recommend to friends.
КЭ
Камила Э.
8 июл. 2026
Underfloor heating in the bedroom — just a fairy tale! Installed in a day, the cost is calculated after diagnostics, but we are very satisfied.
НС
Нурлан С.
7 июл. 2026
We had underfloor heating installed in the kitchen, it works without complaints. The price depends on the scope of work, but the quality is top-notch.
ОП
Ольга П.
4 июл. 2026
I ordered underfloor heating installation, the masters are polite and neat. 2-year warranty, very pleased with the result.
РЖ
Руслан Ж.
2 июл. 2026
We installed a heated floor in the living room, now our feet are always warm. The cost is calculated after diagnostics, but it is worth it.
СК
Светлана К.
17 июн. 2026
I am very pleased with the heated floor in the children's room; it was installed quickly and safely. The price depends on the scope of work, but the result is excellent.
ТО
Тимур О.
26 мая 2026
Ordered underfloor heating in the house, everything was done professionally. 2-year warranty, I recommend to everyone!
ФН
Фарида Н.
19 мая 2026
Underfloor heating in the hallway — an excellent solution. Installed neatly, the cost is calculated after diagnostics, we are satisfied.
ЭД
Эрмек Д.
12 мая 2026
We had underfloor heating installed in the bathroom and toilet, everything works perfectly. The price depends on the scope of work, but the quality is super.
ЮР
Юлия Р.
30 апр. 2026
I ordered underfloor heating on the balcony, now it's warm and cozy there. 2-year warranty, very pleased with the masters' work.
МО
Мадина О.
19 апр. 2026
Thank you for the heated floor! The price is fair, the result is excellent.
ДС
Дамир С.
13 апр. 2026
Thank you for the heated floor! The price is fair, the result is excellent.
АБ
Асхат Б.
7 апр. 2026
Thank you for the underfloor heating! The price is fair, the result is excellent.
ИГ
Ирина Г.
4 апр. 2026
Thank you for the heated floor! The price is fair, the result is excellent.
ТН
Тимур Н.
2 апр. 2026
Thank you for the underfloor heating! The price is fair, the result is excellent.
ЕК
Ержан К.
8 мар. 2026
They installed the underfloor heating faster than promised. Pleasantly surprised.
НБ
Нурлан Б.
3 мар. 2026
Quality underfloor heating, neat and without extra mess. I will come back again.
СК
Сауле К.
26 фев. 2026
Thank you for the heated floor! The price is fair, the result is excellent.
БМ
Бекзат М.
28 янв. 2026
Thank you for the heated floor! The price is fair, the result is excellent.
МА
Марат А.
17 янв. 2026
Called a master for underfloor heating — arrived the same day, everything works.
ЕК
Ержан К.
12 янв. 2026
Reasonable prices for underfloor heating, no markups. Everything is fair.

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about warm floors

Answers to the most popular questions from our clients

Installation of a water underfloor heating starts from 900 som; the final amount depends on the area and the laying scheme. The master names the exact cost after a free diagnostics.
Laying of a heating cable — from 390 som, this price is one of the most affordable in the price list. If installation of a heating section is needed, it costs from 450 som.
A master completes a small room with electric underfloor heating in one day; a water circuit with a manifold and screed takes 2–3 days. The exact time depends on the area and the chosen system.
We provide a 2-year warranty on all underfloor heating work. If a problem with installation or connection appears during this period, we will come and fix it free of charge.
The visit and diagnostics are free if you agree to repair or installation. The technician will inspect the room, measure the area and immediately give you the cost of the work.
For an electric system you will need a heating cable or film, a thermostat and a temperature sensor. For a water system — pipes, a manifold unit, thermal insulation, damping tape and reinforcing mesh.
Yes, under tiles a heating cable or mat is most often installed, and a screed is poured on top. Laying infrared film — from 490 som, installing an underfloor heating mat — from 550 som.
For cable and water systems a screed is mandatory; it protects the circuit and distributes heat. Pouring a screed for underfloor heating — from 900 som.
The thermostat is selected according to the system's power and the area: for small rooms a programmable one is enough, for large ones — one with a floor sensor. Installing a thermostat — from 590 som, replacing — from 850 som.
First we check the thermostat and sensor, then we test the cable for continuity or pressure-test the water circuit. Repairing a heating cable — from 900 som, repairing a water circuit — from 1 500 som.
Clear the floor of furniture and the old covering, remove dust and debris. The technician needs free access to the walls for connecting the thermostat and to the boiler if the system is a water one.
Yes, pressure testing of the underfloor heating system — from 650 som, commissioning — from 990 som. After start-up we check the uniformity of heating and balance the circuits.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на