Ремонт техники Специалисты Строительство и ремонт Другое Страны

Specialist for electrical wiring in a house in Bishkek

Install electrical wiring in a house in Bishkek

We give the exact estimate before work begins, the site visit and diagnostics are free, 2-year warranty on installation.

12 years of experience
850+ projects
Arrival within 2 hours
Examples of work — wiring the house
Ulan Kadyrov
Specialist
4.9
Types of services

Our electrical installation work in Bishkek

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Electrical distribution wiring
We lay lines throughout an apartment or house: power groups, lighting, low-voltage systems, with connections by floor and room.
Дверная москитная сетка
Electrical panel assembly
We assemble the panel: main circuit breaker, RCD, groups on a DIN rail, line marking and a signed diagram inside the door.
Сетка Плиссе
Installation of the service entrance cable
We run the cable from the support or the input distribution device to the panel, crimp the lugs, and secure it along the facade and through the wall entry.
Антикошка PetScreen
Socket installation
We install the mounting box, strip the cores, connect the mechanism and fit the frame with the switch flush with the wall.
Антипыль Micro Mesh
Double socket installation
We mount a two-gang mechanism in a shared mounting box, distribute the cores and close it with a shared frame for two outlets.
Нестандартная москитная сетка
Switch installation
We install a single-gang mechanism, connect the phase to the terminal, and set the body level exactly.
Раздвижная москитная сетка
Two-way switch
We connect a three-terminal switch for controlling light from two points, and check both switching circuits.
Магнитная рамка
Installation of a socket block
We assemble a block of several sockets in one row, connect them in a loop and bring them out onto a single frame.
Сетка-штора на магнитах
Chandelier installation
We attach the chandelier to the ceiling, assemble the arms, connect the phase, neutral and ground, and check the switch operation.
Pricing

Prices for wiring a house in Bishkek

Service type Description Price Warranty
Electrical wiring in a new building Full installation, wall chasing, cable от 5 900 сом 2 years
Electrical panel assembly Modules, circuit breakers, RCD от 5 500 сом 2 years
Installation of the input cable Connection to the network, meter от 4 900 сом 2 years
Installation of a socket Single, hidden wiring от 490 сом 2 years
Installation of a double socket Unit, hidden installation от 900 сом 2 years
Switch installation Single-key, hidden от 590 сом 2 years
Installation of a two-way switch Two-gang, circuit от 1 500 сом 2 years
Installation of a socket block Three or more, in a row от 1 900 сом 2 years
Installation of a chandelier Assembly, suspension, connection от 2 500 сом 2 years
Installation of a spot light fixture Ceiling, recessed от 900 сом 2 years
Installation of a track light Busbar, mounting, connection от 2 900 сом 2 years
Wall sconce installation Wall-mounted, hidden wiring от 3 500 сом 2 years
LED lighting connection Strip, power supply, profile от 3 900 сом 2 years
Chasing walls for cable Concrete, brick, dust removal от 4 500 сом 2 years
Laying of cable in a corrugated conduit Open, along the ceiling от 900 сом 2 years
Laying of cable in a chase Hidden, with sealing от 2 900 сом 2 years
Cable duct installation Plastic, surface-mounted от 900 сом 2 years
Pulling cable through a conduit Corrugated conduit, metal hose от 3 900 сом 2 years
Installation of a circuit breaker Single-phase, DIN rail от 900 сом 2 years
Installation of an RCD Leakage protection, connection от 900 сом 2 years
RCD circuit breaker installation Combined, DIN rail от 2 900 сом 2 years
Installation of a voltage relay Equipment protection, setup от 3 900 сом 2 years
Replacement of the electrical panel Dismantling, assembly, connection от 4 900 сом 2 years
Installation of a grounding loop Pins, welding, measurement от 590 сом 2 years
Grounding connection Busbar, conductor, terminal от 2 900 сом 2 years
Lightning protection installation Receiver, lightning rod от 4 900 сом 2 years
Laying of internet cable Twisted pair, connector от 900 сом 2 years
TV socket installation Coaxial, hidden installation от 900 сом 2 years
Intercom installation Handset, call, connection от 3 900 сом 2 years
Finding a wiring break Cable locator, hidden walls от 4 900 сом 2 years
Search for a short circuit Panel, lines, devices от 5 900 сом 2 years
Replacement of a section of wiring Emergency, local от 3 900 сом 2 years
Electric stove connection Separate line, terminals от 4 900 сом 2 years
Water heater connection Line, circuit breaker, grounding от 5 900 сом 2 years
Connection of a washing machine Socket, line, protection от 2 900 сом 2 years
Installation of a generator Input, switching, grounding от 4 900 сом 2 years
Stabilizer installation Single-phase, connection от 2 900 сом 2 years
Why Us

Our advantages in installing electrical wiring in a house

Project before installation in 1 day

The panel diagram, cable routes and loads are agreed within 1 day, so that wall chasing and cabling don't have to be redone after finishing.

Site visit within 2 hours

The engineer arrives anywhere in Bishkek within 2 hours, takes measurements and records the connection points before any work begins.

Estimate in 1 day with no hidden extra charges

The estimate for house electrical work is prepared in 1 day based on 3 scenarios, the cost is calculated after diagnostics and does not change during the process.

Electrical installation in 3 days

Full cycle for a house up to 150 sq.m: wall chasing, cable, panel, sockets and lighting — 3 days, 4 electricians on site.

2-year warranty on all work

2-year warranty on the panel, routes and connections, warranty visit in Bishkek within 2 hours with no waiting.

850+ sites in Bishkek

850+ completed sites: apartments, houses, commercial premises, we know the norms and connection specifics in Bishkek.

12 years of experience in electrical installation

12 years of experience, 6 specialized permits, every electrician undergoes a knowledge check once every 12 months.

10% discount on a repeat visit

10% discount on repeat requests and 10% when ordering electrical work together with plumbing in one stage.

Process

Order stages

01

Inspection and measurements

The engineer arrives at the site, studies the layout, calculates the load and connection points. Records everything in a report.

02

Diagram and project

We prepare a single-line diagram of the panel, cable routes and group locations. We agree it with you before work begins.

03

Chasing and laying

We carefully chase the walls, drill passages, lay the cable in corrugated conduit. We work with a vacuum cleaner so as not to spread dust.

04

Panel assembly

We install circuit breakers, RCDs, voltage relays, label each line. We assemble according to the diagram, check the contacts.

05

Installation of points

We install mounting boxes, sockets, switches, light fixtures. We test each group under load.

06

Handover and warranty

We run tests, show the result, hand over the diagram and the acceptance report. A 2-year warranty applies to the work.

Team

Our specialists in installing electrical wiring in a house

Абдиев Нурлан

Abdiev Nurlan

Power network electrical installer

9 years of experience
115 reviews 4.9
Асанов Тимур

Asanov Timur

Electrical equipment adjuster

16 years of experience
191 reviews 4.9
Ибраимова Айгуль

Ibraimova Aigul

Service department administrator

7 years of experience
184 reviews 4.8
Жумабеков Эрмек

Zhumabekov Ermek

Cable line electrician

9 years of experience
96 reviews 4.7
Сыдыков Бакыт

Sydykov Bakyt

Electrical engineer

15 years of experience
75 reviews 5.0
Смирнова Елена

Smirnova Elena

Emergency call-out coordinator

5 years of experience
193 reviews 4.9
Осмонов Азамат

Osmonov Azamat

Electrical measurement specialist

6 years of experience
181 reviews 4.7
Кузнецов Дмитрий

Kuznetsov Dmitry

Dispatch service operator

16 years of experience
130 reviews 4.8
Cases

Case studies on installing electrical wiring in a house

Установка рамочной сетки
Electrical distribution wiring in a new building for finishing
5,900 som
2 year warranty
Problem
An apartment without finishing, full electrical work needed for finishing
Diagnostics
Checked the service entrance cable and the riser, drew up a diagram of lighting and socket groups
Solution
Performed electrical distribution wiring throughout the apartment: chases, corrugated sleeve, mounting boxes, leads for the panel
Абдиев Нурлан
Abdiev Nurlan
Power network electrician
4.9
Установка дверной сетки
Assembly and connection of an electrical panel in a private house
5,500 som
2 year warranty
Problem
The old panel with fuses was overheating and knocking out the power in the whole house
Diagnostics
Identified worn-out circuit breakers and the absence of an RCD, wiring without grounding
Solution
Assembled a new panel on a DIN rail, installed circuit breakers and an RCD, labeled the groups
Асанов Тимур
Asanov Timur
Electrical equipment adjuster
4.8
Установка сетки Антикошка
Replacement of the incoming cable from the pole to the house
4,900 som
2 year warranty
Problem
Voltage drop when turning on powerful appliances, the cable was heating up at the input
Diagnostics
Detected insufficient cross-section of the old aluminum input and damaged insulation
Solution
Laid a new copper incoming cable in a corrugated conduit, connected it to the panel and meter
Ибраимова Айгуль
Ibraimova Aigul
Service department administrator
4.9
Нестандартная сетка
Installation of a socket in the kitchen to replace the old one
490 som
2 year warranty
Problem
The kitchen socket was sparking and wouldn't hold the plug
Diagnostics
The contacts were burnt and the terminal was loose, the mounting box was cracked
Solution
Replaced the mounting box and installed a new grounded socket
Жумабеков Эрмек
Zhumabekov Ermek
Electrician for cable lines
4.7
Раздвижные сетки
Installation of a socket block in the work area
1,900 som
2 year warranty
Problem
There weren't enough sockets above the countertop for appliances
Diagnostics
Checked the existing line, its cross-section is sufficient for the additional load
Solution
Installed a block of four sockets, connected it to a separate line via a circuit breaker
Сыдыков Бакыт
Sydykov Bakyt
Electrical engineer
5.0
Сетка Антипыль
Installation of a two-way switch in the bedroom
1,500 som
2 year warranty
Problem
The light in the bedroom only turned on at the door, inconvenient to turn off before sleep
Diagnostics
The existing circuit is single-gang, requires rewiring to a two-way switch
Solution
Laid an additional wire and installed a two-way switch by the bed
Смирнова Елена
Smirnova Elena
Emergency call-out coordinator
4.9
Перетяжка полотна
Installation of spotlights in a stretch ceiling
900 som
2 year warranty
Problem
Dim lighting in the living room from a single chandelier
Diagnostics
Calculated the number and power of the points for the room's area, checked the outlets
Solution
Installed eight spotlights and connected them to a dimmer
Абдиев Нурлан
Abdiev Nurlan
Power network electrician
4.8
Сетка Плиссе
Chasing walls for new wiring
4,500 som
2 year warranty
Problem
The wiring was laid openly along the walls and interfered with the renovation
Diagnostics
Identified load-bearing sections and safe routes for the chases
Solution
Chased the walls for the cable, laid the wire in the chase and plastered it over
Асанов Тимур
Asanov Timur
Electrical equipment adjuster
5.0
Compatibility

We work with brands from any manufacturer

Professional installation of electrical wiring in a house for all popular brands

Electrical wiring in a house in Bishkek: how Eco-Service does turnkey wiring with a 2-year warranty

Where home electrical work begins: layout, load, and route selection

Electrical work begins not with wall chasing, but with a layout: how many circuits, what load, where the routes will run. Without this stage, any wiring turns into rework. Let's break down how we calculate the load, choose the route, and the type of installation.

How to calculate the load and choose the cable cross-section

At Eco-Service, the calculation starts with a list of appliances: for socket groups, a 3×2.5 mm² cable is used, for lighting — 3×1.5 mm², and the incoming line is calculated based on total power. In a Bishkek apartment with a 2 kW boiler, a 2.2 kW washing machine, a 2.5 kW air conditioner, and a 7 kW electric stove, the total load reaches 15-16 kW — for this, the incoming cable is taken as 3×6 mm² or 3×10 mm², and each high-power circuit gets its own circuit breaker. The cross-section is selected not by the socket's current rating, but by the cable's long-term permissible current with a 20-25% margin: 2.5 mm² copper handles 25 A, but the breaker on such a circuit is set to 16 A. If you calculate the load "by eye," the breaker will trip when the boiler, washing machine, and air conditioner are turned on simultaneously — redoing the panel will cost more than the initial calculation. If you're figuring out how much it costs to install electrical wiring in a house, a layout with pre-set ratings saves on redoing the panel.

Apartment electrical routing along the floor vs. the ceiling — which to choose

  • Renovation stage: ceiling routing is cheaper at the wall-chasing stage — the route is shorter, and walls barely need to be opened up.
  • Wet zones: in the bathroom and kitchen, the line to the boiler and washing machine is run along the floor — if there's a leak from above, the cable in the conduit gets wet and loses its insulation.
  • Ceiling height: 4-5 cm of clearance is needed under a stretch ceiling, otherwise the conduit with the cable presses against the frame.
  • Serviceability: floor routing in the screed is inaccessible without opening the floor, but it's protected from accidental drilling from above.
  • Combination with underfloor heating: the route is laid along the floor below the heating cable, otherwise it overheats.

Concealed or exposed wiring: where each type of installation is appropriate

In new buildings in Bishkek, we run concealed wiring in chases under plaster, and in older housing stock without renovation — exposed wiring in cable ducts, so as not to chase load-bearing walls. A chase for a 3×2.5 mm² cable is 20×30 mm, up to 30 mm deep; in panel buildings 1-464 and 1-335, cutting load-bearing panels for horizontal chases is not allowed, so the route is run along the ceiling or floor in conduit. Exposed installation in a 25×16 mm cable duct takes 30-40% less time than wall chasing, but puts the line on display. Concealed wiring is cheaper at the finishing stage but more expensive to rework: if you want to add a socket, you'll have to open up the wall — that's why the point layout is agreed upon before chasing. When comparing how much it costs to install wiring in an apartment, the difference between concealed and exposed installation is already visible at the wall-chasing stage.

Design sequence: from the appliance list to an approved layout

  • Appliance list: everything with its power in kW is written down — from the chandelier to the generator, including a future air conditioner and boiler.
  • Grouping circuits: high-power consumers (stove, boiler, washing machine) get their own breaker, socket groups are combined by room.
  • Cross-section calculation: based on the total power of each circuit, copper of 1.5-10 mm² is selected with a 20-25% current margin.
  • Point layout: sockets, switches, lighting outlets, and their anchoring to walls are marked on the plan before chasing begins.
  • Approval: the layout is signed off with the client — edits after chasing cost opening up finished finishes.

How the cost of wiring work is calculated

The cost of wiring depends on the number of lines, the footage of the runs, and the type of installation — concealed is more expensive than exposed due to wall chasing. The estimate is assembled from three parts: circuit design, rough-in installation (chases, corrugated conduit, pulling wires), and finish installation (sockets, switches, light fixtures). To the question of how much it costs to install electricity in an apartment, an exact answer is given after inspecting the site and counting the points — only a range is quoted over the phone. If they ask how much it costs to install electrical wiring in an apartment from scratch in a new building, each line is calculated separately: the service entrance, the panel, the socket and lighting circuits. The spread across projects is wide: a one-bedroom apartment with 30 points and a 200 m² house with a generator are different estimates, so a fixed price is not quoted without a site visit.

Electrical wiring in a new building and a private house: how the work differs

A new building, a resale apartment and a private house require different approaches: in some places the walls are already finished, in others a service drop from a pole is needed, and in others a single room is enough. We break down how the type of property changes the layout and the scope of work.

Electrical wiring in a new building: why it's more cost-effective to do it before renovation

Wiring in a new building is done before the final finishing: we chase the concrete, run cable in corrugated conduit and assemble the panel while the walls are still open. In Bishkek residential complexes, the developer most often leaves only the incoming cable and one socket in the room — the owner finishes the rest themselves. In monolithic partition walls, chasing goes to a depth of up to 25 mm; in load-bearing walls — only vertically and no longer than a third of the floor height. We install a 12-18 module electrical panel in the hallway next to the service entrance. Clients often phrase their request as: wiring in an apartment price — and from that phrase it's immediately clear that the person needs a turnkey estimate, not a separate service. If the lines aren't laid before plastering, the cable will later have to be run in trunking on top of the walls — and that's already exposed wiring in a living room. Installation in a new building at Eco-Service is performed turnkey: from chasing to panel assembly.

Electrical wiring in a private house: service drop, grounding, lines across the property

  • Incoming cable: from the pole to the panel we run SIP or copper cable in a pipe, entering through a sleeve in the wall below the frost line.
  • Grounding loop: three rods of 3 meters each, welded to a 40×4 mm strip, with resistance no higher than 10 Ohms — we lay it before pouring the apron.
  • Wiring in a private house: lines to the kitchen, bathrooms, bedrooms and outbuildings run as separate groups from a 24-36 module panel.
  • RCD: for wet areas and outdoor lines we install separate devices at 30 mA; at the service entrance — a fire-protection one at 100 mA.
  • Outdoor lighting and pump: a separate line in corrugated conduit along the facade and the property, with a labeled breaker in the panel.

If you're interested in electrical wiring in a private house price, it's calculated after measuring the runs across the property and the number of groups.

Electrical wiring in a one-room apartment and in a room: how many lines are needed

Wiring in a one-room apartment usually fits into 4-6 groups: kitchen, bathroom, room, hallway, lighting and a separate line for the air conditioner. Wiring in a room is a minimum of two groups: socket and lighting, plus a separate branch for the air conditioner or heater. In the kitchen we allocate a line for the cooktop and oven; for the bathroom — for the washing machine and water heater with a 10 mA RCD. We take a 16 A circuit breaker for the socket group, a 10 A one for lighting, and cable — VVGng-LS 3×2.5 and 3×1.5 mm² respectively. Owners of resale apartments often ask how to run new wiring in an apartment without opening up all the finishes — and here the choice of route is what decides it. Even in a single room it's worth separating the socket and lighting lines: if they're on the same breaker, a short circuit in the chandelier will leave you without electricity in the entire room.

Comparison of work by property type

Property type What's included Wiring type Special feature
New building Chasing, wiring, panel Concealed Do before plastering
Private house Service drop, grounding, wiring Concealed or exposed Grounding loop
One-room apartment 4-6 groups, panel Concealed Separate line for air conditioner
Resale without renovation Exposed in trunking Exposed No chasing of load-bearing walls

The estimate is calculated after measuring the footage of the runs and the number of groups: the price is affected by the linear meters of chasing, the number of points and panel modules.

Work stages: from wall chasing to lighting connection

After the agreed-upon plan, installation begins: first we mark and cut the routes, then we lay the cable, assemble the panel and bring out the points — sockets, switches and lights. The order of stages is strict: mixing them up means breaking open fresh plaster.

Wall chasing and cable laying: corrugated conduit, chase, pipe, cable duct

  • Chase under plaster: the main method for concrete and brick inside an apartment — the cable goes into the wall and is covered with plaster flush.
  • Corrugated conduit on the ceiling: we use it under stretch or drywall ceilings, where there is nothing to chase, and the cable must lie flat and not sag.
  • Pipe outdoors and in the garage: for the service drop from a pole, lines along the facade and the plot — HDPE or metal pipe protects against moisture and UV.
  • Cable duct for open installation: we install it in utility rooms, country houses and rooms with concrete walls that cannot be chased.
  • Pulling through a pipe: corrugated conduit and pipe allow pulling out the old wire and running a new one without opening the wall — this is how Eco-Service replaces the wiring in apartments in panel buildings in Bishkek.

Assembling the electrical panel: circuit breakers, RCDs and distribution of groups

We assemble the electrical panel with a separate circuit breaker for each group and an RCD for wet zones — the kitchen, bathroom and outdoor lines. In a typical two-room apartment, this comes to 8-12 groups: lighting by room, socket lines, a separate kitchen line for the cooktop, a separate one for the boiler and washing machine. We calculate the main circuit breaker based on the allocated power, not on the rating of the old one — in Bishkek's panel series (104, 105, 106) the service entrance is often limited, and an inflated rating trips the neighbor's panel. We install 30 mA RCDs for socket groups and 10 mA for the bathroom, and RCBOs where space in the panel is limited. Clients often phrase the task like this: wiring an apartment price — and after calculating the groups it becomes a clear figure in the estimate. Do not put one circuit breaker on the whole apartment: in an emergency you will cut power to the entire home, and finding the faulty line without separating the groups is almost impossible.

Installation of sockets, switches and two-way switches

  • Single and double socket: basic points in living rooms — we put a double one at the desk and at the head of the bed so as not to multiply extension adapters.
  • Socket block: 3-4 points in one back box in the kitchen and in the workshop — appliances stand next to each other rather than being reached with extension cords across the room.
  • Regular switch: one per room, we install it at a height of 90 cm from the floor at the entrance on the side of the door handle.
  • Two-way switch: two on one line in corridors, on staircases and in bedrooms — the light turns on at the entrance and goes off at the exit.
  • Hidden back boxes for drywall: a separate type of mounting for partitions where there is no concrete for a screw — on drywall we install only expansion models.

Lighting installation: chandeliers, recessed, track lights, wall sconces, LED

At the final stage we hang chandeliers, mount recessed and track lights, wall sconces and connect LED lighting — each lighting group goes to its own switch. We mount recessed ceiling lights on drywall on embedded supports or expansion legs, and we fasten track systems to the load-bearing slab, because a busbar with three or four lights weighs a fair amount. A wall sconce on a concrete wall requires a back box for the wire outlet — without it, installation ends up surface-mounted. LED lighting and track systems are best included in the plan in advance: they have a separate power supply, and without a prepared line it will have to be hidden in a surface-mounted box. In requests, clients write it in different ways, and one of the common phrasings is — wiring in an apartment price: behind it is the same scope of work as in a city apartment, only taking into account the service drop from a pole, outdoor lines and a separate panel for each zone of the plot. We break such a project into stages and close it out with a completion report.

How we control quality and what we check during acceptance

The quality of electrical installation is not visible after finishing — the cable goes under the plaster, and it can only be assessed with instruments. That is why we test every line before the walls are closed up, and record the result in a report.

Checking lines, grounding and PUE standards before handover

Most often, clients ask how much it costs to do the electrical wiring in an apartment, even before the technician's visit — and they get an answer after inspecting the panel and the routes. During acceptance, we check each group for breaks and short circuits, verify the actual connection against the panel diagram, and measure the grounding resistance with an instrument: for a private house, the norm is up to 30 Ohms with a contour made of angle steel or strip. We test the RCD under load, not only at idle, and compare the ratings of the circuit breakers with the calculated load of the groups, so that in the event of a short circuit at the sockets, the main incoming breaker does not trip. We photograph the wiring before plastering and hand it over to the client together with the report — when drilling into a wall a year later, this is the only way to avoid hitting a cable. We check PUE standards for the cross-section under load, the installation height of sockets, and the presence of a grounding conductor in every line. At Eco-Service, acceptance is documented with a report containing measurements: the client receives the diagram, the resistance protocol, and photographic documentation before the walls are closed up.

Typical wiring mistakes and how to avoid them

Twisted connections without soldering oxidize and heat up under load — switch to Wago terminals, ferrules or soldering, even if the connection has "worked" for years. One breaker for all groups means that in the event of a short circuit in the bedroom, the entire apartment goes dark, so we run lighting, sockets and high-power appliances on separate lines. Sockets without a third conductor cause electric shock when the insulation breaks down and cause washing machines with electronics to fail. A line with a boiler or a hob must not use 1.5 mm² instead of 2.5–4 mm² — the conductor heats up under load. A bathroom and kitchen without residual current protection are a direct risk in the event of leakage through water. When clients look for "do electrical wiring in an apartment," the price in their understanding is made up of points and the panel, but in reality it depends on the length of the routes and the wall material. A separate topic is the wiring of cables in an apartment: it determines how many lines can be brought to the panel without chasing load-bearing walls. In searches, people often type a similar query — and end up here, although the topic is an apartment: in a private house, the supply from the pole, the grounding contour and the outdoor route are added. Those who want to do the wiring in an apartment with their own hands most often underestimate the chasing of concrete and the selection of circuit breakers by group — it is at this stage that the mistakes we examine during acceptance come to light.

Warranty, timelines and request intake through the service center in Bishkek

We take responsibility for the installation and after the project is handed over: warranty, realistic timelines and in-person request intake at our own service center — without dispatchers or middlemen between you and the crew.

2-year warranty on electrical installation: what it covers

We provide a 2-year warranty on all electrical installation work: if a line fails through our fault, the crew will come and fix it at no extra charge. The coverage applies to wall chasing, cable laying in corrugated conduit and chases, panel assembly, installation of circuit breakers and RCDs, installation of sockets, switches and lighting points — that is, the entire cycle that is performed when you decide to have turnkey wiring installed in an apartment. The warranty remains valid as long as you do not redo our scheme yourself: if you replace a circuit breaker or socket on your own, responsibility for that specific unit is voided. If you want to modify a line later, invite our technician — he will preserve the warranty on the rest of the wiring.

Timelines for electrical wiring installation and what they depend on

We complete wiring in a one-room apartment in 2-4 days, in a private house — from a week; we give the exact timeline after inspecting the site. In a living area of 35-45 square meters with 25-30 points, a crew of two electricians finishes wall chasing and cable laying in the first two days, and another day or two goes into the panel, sockets and light fixtures. Clients often search for "electrical wiring installation in a private house price" and land on our page — in practice, the timeline here depends on the number of points and the condition of the walls: on bare concrete the work goes faster than in a resale property with old wiring. If you need to install electrical wiring in a house, timelines are calculated from the volume of runs: for a resale property, demolition of old lines and bypassing load-bearing walls are added — that is plus 1-2 days to the plan.

Our own service center in Bishkek: request intake without middlemen

Requests are handled by our own service center in Bishkek: you discuss the site directly with the crew, not through a dispatcher or middleman. The work schedule for apartment wiring is agreed upon during the inspection — the technician records the points, calculates the footage of wall chasing and selects the cable cross-section for your load. When ordering through a middleman, a different crew often arrives at the site: with a direct contractor, the technician who inspected the site continues to manage it, so disputed points along the route are resolved on site, without correspondence between contractors. If you are comparing offers and looking for where to install wiring in a house, where the price is calculated by actual volume rather than by a rough price list — request a quote after the inspection: it will show exactly what is included in the estimate. We will also clarify how the price is formed: it depends on the footage of wall chasing, the number of points and the type of cable — the technician records these parameters during the inspection.

How to order electrical installation: from request to handover of the facility

Ordering electrical installation is simple: you submit a request, we inspect the facility, agree on the layout and the estimate — and only then do we start work. Below is the path from the call to the signed acceptance certificate.

Request, facility inspection and layout approval

  • Request: you submit an inquiry at the service center in Bishkek or via the form — we record the address, type of facility and the task.
  • Electrician's visit to the home: the specialist measures the areas, counts the number of points and checks the condition of the incoming cable.
  • Layout approval: we determine the routes, the number of groups, the location of the panel and the rating of the circuit breakers for your load.
  • Scope calculation: the client receives a list of items showing how much it costs to do the electrical work in the house for each job.
  • Contract: we fix the deadlines, the stages and a 2-year warranty — before the chasing begins.

Connecting the electrical system in an apartment and handing over the work

At handover, we connect the apartment to the panel, test each group under load and hand over the wiring diagram with photos of the concealed routes. Before acceptance, the wiring in the house is verified on site: we label the circuit breakers, ring out the lines, and measure the grounding resistance. Clients often ask how much it costs to run the wiring in a house — we answer already at the inspection, after measuring the routes and counting the points. If the wiring was done in a private house, we separately check the incoming line, the grounding loop and the lines across the plot. We test the socket groups under an iron and a kettle, and the lighting ones under chandeliers and spotlights. When connecting in an apartment, it is important that the incoming cable and the breaker on the panel match in cross-section — otherwise, under peak load, the protection will trip. The second common question is how much it costs to run the electrical wiring: the total depends on the meterage of chasing, the number of groups and the wall material. Clients often phrase it as: wiring throughout the house — and from that phrase the master immediately understands that a full cycle is needed from the panel to the last socket. Eco-Service hands over the facility with a certificate listing the tested lines. Do not order the finishing right after installation — allow a day to check all the lines under real load, in order to identify weak connections before plastering.

Conclusion

Electrical installation rests on three things: correct calculation, neat routing and honest acceptance. Below is a short summary that will help you avoid losing money and nerves on rework.

Main takeaways

  • The layout matters more than speed. Load calculation and route selection are done before chasing — rework after renovation costs as much as new wiring.
  • The type of facility determines the work. In a new building it is chasing and full wiring; in a private house, the incoming line and grounding are added.
  • Separate the groups. A separate breaker for each line and an RCD for wet areas make troubleshooting easier.
  • Check before finishing. Ringing out the lines, testing the RCD and photographing the concealed routes are a mandatory part of acceptance.
  • Record the warranty. The period of responsibility for the installation and the conditions for maintaining it should be specified before work begins.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азамат К.
26 сен. 2026
I ordered wiring in a new building, everything was done neatly and quickly. 2-year warranty, which is very pleasing.
ЕВ
Елена В.
23 сен. 2026
They did electrical wiring in a private house, worked cleanly, without dust. The cost is calculated after diagnostics, but the result is excellent.
НС
Нурлан С.
22 сен. 2026
Excellent specialists, they did the wiring in a two-story house. Everything works, 2-year warranty.
ГТ
Гульнара Т.
12 сен. 2026
I ordered wiring in the apartment, they did it quickly and with quality. The price depends on the scope of work, but I'm satisfied.
ТА
Тимур А.
8 сен. 2026
Did the wiring in the house, everything neat, sockets and switches in their places. 2-year warranty.
АМ
Айгуль М.
27 авг. 2026
I am very pleased with the work of the electricians, they did the wiring in the new house. The cost is calculated after diagnostics, but the result exceeded expectations.
ДЛ
Дмитрий Л.
19 авг. 2026
I ordered electrical work in a cottage, everything was done conscientiously. 2-year warranty, I recommend.
ЖБ
Жанара Б.
13 авг. 2026
They wired a private house, the masters are polite, explained everything. The price depends on the scope of work, but I was satisfied.
ИО
Ильяс О.
12 авг. 2026
They did the wiring in the house quickly and with high quality. 2-year warranty, which is important.
СП
Светлана П.
27 июл. 2026
I ordered electrical work in an apartment, everything was done in a day. The cost is calculated after diagnostics, but the result is excellent.
БЖ
Бакыт Ж.
23 июл. 2026
They wired the house, everything works without complaints. 2-year warranty.
АС
Алина С.
30 июн. 2026
Very pleased, they did the wiring in the new building. The price depends on the scope of work, but the quality is top-notch.
ЭТ
Эрмек Т.
23 июн. 2026
I ordered wiring in a private house, everything was done neatly and on time. 2-year warranty.
МК
Марина К.
20 июн. 2026
They wired the house, the masters are professionals. The cost is calculated after diagnostics, but I'm satisfied with the result.
УС
Улан С.
11 июн. 2026
Excellent work, did the wiring in the house. 2-year warranty, I recommend.
АН
Айжан Н.
5 июн. 2026
I ordered electrical work in an apartment, everything was done quickly and cleanly. The price depends on the scope of work, but the result is pleasing.
ЕР
Елена Р.
14 мая 2026
I called a specialist to do electrical wiring in the house — he came the same day, everything works.
ГС
Гульнара С.
3 мая 2026
Very polite master, explained everything about wiring the house. I recommend to friends.
АТ
Алмас Т.
2 мая 2026
I ordered wiring the house — they arrived on time, did everything neatly. Satisfied!
ГС
Гульнара С.
27 апр. 2026
They did the electrical wiring in the house faster than promised. Pleasantly surprised.
ИГ
Ирина Г.
10 апр. 2026
Good work, the masters know their craft. They wired the house conscientiously.
ДС
Дамир С.
5 апр. 2026
High-quality electrical wiring in the house, neat and without unnecessary mess. I will contact them again.
АБ
Асхат Б.
25 мар. 2026
Very polite master, explained everything about wiring the house. I recommend to friends.
ЖУ
Жанар У.
24 мар. 2026
They wired the house faster than promised. Pleasantly surprised.
ВЛ
Виктор Л.
18 мар. 2026
Good work, the specialists know their craft. They did the electrical wiring in the house conscientiously.
МО
Мадина О.
16 мар. 2026
Reasonable prices for wiring the house, no markups. Everything is fair.
СП
Светлана П.
7 мар. 2026
I called a specialist to do electrical wiring in the house — he came the same day, everything works.
АТ
Алмас Т.
25 фев. 2026
I contacted them for electrical wiring in the house, they did it quickly and with high quality. I recommend.
БМ
Бекзат М.
22 фев. 2026
I contacted them for electrical wiring in the house, they did it quickly and with high quality. I recommend.
АБ
Асхат Б.
7 фев. 2026
Thank you for wiring the house! The price is fair, the result is excellent.
АТ
Айгерим Т.
9 янв. 2026
Very polite master, explained everything about wiring the house. I recommend to friends.
АФ
Анна Ф.
4 янв. 2026
A very polite specialist, he explained everything about the electrical wiring in the house. I recommend to friends.

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about installing electrical wiring in a house

Answers to the most popular questions from our clients

The cost depends on the scope: electrical wiring in a new building — from 5,900 som, socket installation — from 490 som, and a typical invoice per property comes to about 2,900 som. The master names the exact amount after inspection.
A small scope — sockets, switches, light fixtures — we complete in one visit, usually in 2–4 hours. Full electrical wiring in a house with wall chasing and panel assembly takes from several days, the timeframe depends on the area and the number of points.
We provide a 2-year warranty for all electrical work in a house. If anything we did fails during this period, we will come and fix it free of charge.
The call-out and diagnostics are free if you agree to the repair. The master comes to the property, inspects the wiring and panel, and then names the exact cost of the work.
Cable, corrugated conduit, mounting boxes, circuit breakers, an RCD and the panel itself — all of this can be bought on your own or ordered from us. The master will advise the required cable cross-section and the rating of the circuit breakers for your load.
Yes, we also work in residential premises: we lay the cable in a cable duct or in corrugated conduit, and we only chase (groove) walls where it is permitted. We try to minimize dust and debris and we clean up after ourselves.
Yes, we chase the walls for the cable and lay the line in the groove, after which we bring the points out with mounting boxes. This method looks neater and does not interfere with the finishing.
The number of points is unlimited — we design the scheme for your needs: kitchen, bedrooms, appliances, lighting. Installing a socket — from 490 som, a switch — from 590 som, a block of sockets — from 1,900 som.
Yes, assembling the electrical panel — from 5,500 som, including circuit breakers, RCDs and labeled groups. We install the panel so that it is convenient to use and easy to de-energize the required line.
Payment after the work is completed, in cash or by transfer. We take a prepayment only for materials if you order them through us.
Free up access to the walls and the panel, remove furniture and fragile items from the work area. If you have an old wiring plan or panel diagram — show it to the technician, this will speed up the work.
Yes, we do the full cycle: cable entry, distribution to the rooms, panel, sockets, switches and lighting. Installation of the incoming cable — from 4,900 som, electrical distribution in a new building — from 5,900 som.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на