Technician for the installation of electricity meters in Bishkek

Installation of electricity meters Bishkek

Visit and diagnostics free of charge, installation in one visit, 2-year warranty on work and the connection scheme.

5-year certificate
1200+ facilities
Installation in 2 hours
Rustam Osmonov, Expert electrical installer
Rustam Osmonov
Expert electrical installer
5
Types of services

Our work on installing electricity meters in Bishkek

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Installation of a single-phase meter
Installation of a new single-phase metering device on a DIN rail in a panel, connection to a 220 V network, checking disk rotation
Дверная москитная сетка
Installation of a three-phase meter
Installation of a three-phase metering device with connection of all three phases and neutral, monitoring of phase sequence and load balance
Сетка Плиссе
Replacement of a single-phase meter
Dismantling of the old single-phase device and installation of a new one while preserving the connection scheme and re-marking the wires
Антикошка PetScreen
Replacement of a three-phase meter
Removal of the worn-out three-phase device and installation of a new one with checking of current circuits and correct phasing
Антипыль Micro Mesh
Relocation of an electricity meter
Moving the metering device to a new location with extension of wires and preservation of the working connection scheme
Нестандартная москитная сетка
Installation of a meter on a pole
Installation of a metering device on a power line pole with organization of a drop and protection from atmospheric influences
Раздвижная москитная сетка
Assembly of a metering panel
Layout and assembly of a metering panel with installation of circuit breakers, busbars and wiring of all circuits according to the scheme
Магнитная рамка
Installation of an input circuit breaker
Installation of an input circuit breaker on a DIN rail with connection of the supply cable and load
Сетка-штора на магнитах
Replacement of a circuit breaker
Dismantling of a faulty circuit breaker and installation of a new one with selection of the rating for the actual line load
Pricing

Prices for the installation of electricity meters in Bishkek

Service type Description Price Warranty
Installation of a single-phase electricity meter Mounting on a DIN rail, connection от 900 сом 2 years
Installation of a three-phase electricity meter Direct connection, up to 100 A от 2 500 сом 2 years
Replacement of a single-phase meter Dismantling the old one, installing the new one от 900 сом 2 years
Replacement of a three-phase meter Removal and installation of the metering device от 2 900 сом 2 years
Relocating the electricity meter Changing the installation location on the panel от 1 900 сом 2 years
Installation of a meter on a support Mounting on a pole, connection от 3 500 сом 2 years
Assembly of a metering panel Complete set of the box for the meter от 3 900 сом 2 years
Installation of the input circuit breaker Installation and connection of protection от 890 сом 2 years
Replacement of a circuit breaker Dismantling and installation of a new one от 790 сом 2 years
Installation of an RCD Connection of protective shutdown от 900 сом 2 years
Installation of a voltage relay Protection against power surges от 1 500 сом 2 years
Laying of cable to the meter Wall chasing and laying the line от 690 сом 2 years
Connecting the cable to the meter Stripping of cores, terminals от 990 сом 2 years
Replacement of the input cable Dismantling of the old line, installation от 900 сом 2 years
Diagnostics of a meter malfunction Checking the circuit and connection бесплатно 2 years
Checking the connection diagram Inspection of terminals and contacts от 900 сом 2 years
Tightening of the meter contacts Tightening of terminal connections от 750 сом 2 years
Sealing after installation Preparation for sealing от 850 сом 2 years
Installation of a box for the meter Installation of the housing on the wall от 900 сом 2 years
Connecting the meter to the load Wiring of lines after the device от 790 сом 2 years
Why Us

Our advantages in installing electricity meters

2-year warranty on the device and installation

Sealing and commissioning certificate, repeat visit in case of failure — under the 2-year warranty

Installation in 2 hours on site

Standard installation of a single-phase meter takes 120 minutes, three-phase — up to 3 hours

1200+ sites in Bishkek

More than 1200 metering devices installed in residential buildings, offices and commercial sites

15 years of experience among the masters

Electricians with specialized certification and over 15 years of experience working on meters

Queue for a visit 1 day

A request submitted before 18:00 is closed by a team visit on the next business day

Certificate of conformity 5 years

Devices with a valid certificate, verification and accuracy class confirmed by documents

10% discount on repeat installation

For clients installing a second meter at the site, a 10% discount applies

Turnkey work with Energosbyt

We take on the connection scheme, sealing and submission of documents to the distribution company

Process

Order stages

01

Request and consultation

We accept the request, clarify the type of site and the task. We agree on a convenient time for the master's visit.

02

Diagnostics and measurements

The master inspects the installation site, checks the condition of the wiring and the panel, determines the connection scheme.

03

Selection of the meter

We offer a suitable model for the load and network requirements. The cost is calculated after diagnostics.

04

Installation and connection

We install the meter, connect it according to the scheme, check the insulation and contacts. The work is performed by an experienced electrician.

05

Check and sealing

We test operation under load, adjust parameters, prepare documents for sealing at the network organization.

06

Handover and warranty

We hand over the site, explain the operating rules. A 2-year warranty applies to the installation.

Team

Our specialists in installing electricity meters

Rustam Osmonov, Expert electrical installer

Rustam Osmonov

Expert electrical installer

6 years of experience
Ratings: 13 5
Aydar Aydarov, Chandelier installation technician

Aydar Aydarov

Chandelier installation technician

15 years of experience
Ratings: 58 4.69
Akim Ibraimov, Diagnostic electrician

Akim Ibraimov

Diagnostic electrician

12 years of experience
Ratings: 84 4.71
Askarbek Abdyldaev, Residential electrician

Askarbek Abdyldaev

Residential electrician

5 years of experience
Ratings: 124 4.35
Begislan Manatbekov, Wiring fault finding technician

Begislan Manatbekov

Wiring fault finding technician

5 years of experience
Ratings: 49 4.64
Damir Kasymbekov, Meter installation technician

Damir Kasymbekov

Meter installation technician

3 years of experience
Ratings: 100 4.9
Damir Shamilbekov, Grounding technician

Damir Shamilbekov

Grounding technician

3 years of experience
Ratings: 62 4.76
Nurlan Zhumaliev, Emergency electrician

Nurlan Zhumaliev

Emergency electrician

8 years of experience
Ratings: 139 4.96
Cases

Cases of electricity meter installation

Установка рамочной сетки
Replacement of a single-phase meter in a private house
900 som
2 year warranty
Problem
The meter stopped spinning its disk, readings do not change when appliances are on
Diagnostics
Mechanical wear of the counting mechanism, the meter cannot be repaired
Solution
We dismantled the old device, installed a new single-phase meter, and sealed it
Установка дверной сетки
Installation of a three-phase meter after renovation
2,500 som
2 year warranty
Problem
After a major home renovation, a new three-phase electricity meter is required
Diagnostics
There is no meter or metering panel, the cable is routed in but not connected
Solution
Installed a three-phase meter, assembled the panel, connected the load, sealed it
Установка сетки Антикошка
Relocating the meter from a damp basement
1,900 som
2 year warranty
Problem
The meter is installed in a basement where there is constant dampness and condensation
Diagnostics
The meter body is covered with moisture, the terminals are oxidized, there is a risk of short circuit
Solution
Moved the meter to the first floor, replaced the incoming cable, tightened the contacts, sealed it
Нестандартная сетка
Installation of a meter on a power line pole
3,500 som
2 year warranty
Problem
The meter needs to be moved outside onto a pole at the request of the power supply organization
Diagnostics
The meter is inside the house, access to it is limited, installation on a pole is needed
Solution
Installed a box and meter on the pole, connected the cable, sealed it
Раздвижные сетки
Assembly of a metering panel for a new house
3,900 som
2 year warranty
Problem
In the new building there is no metering panel, no incoming circuit breaker or RCD
Diagnostics
The cable is routed into the house but not connected; full assembly of the metering unit is required
Solution
Assembled the metering panel, installed the meter, incoming circuit breaker, RCD, voltage relay, connected the load
Сетка Антипыль
Replacement of the incoming circuit breaker in the panel
890 som
2 year warranty
Problem
The incoming circuit breaker trips when powerful appliances are turned on, a burning smell is noticeable
Diagnostics
The circuit breaker contacts are burnt, the body is melted, the breaker is faulty
Solution
Replaced the incoming circuit breaker, tightened the contacts, checked the connection diagram
Перетяжка полотна
Installation of a voltage relay after surges
1,500 som
2 year warranty
Problem
Voltage surges in the network, household appliances are failing
Diagnostics
The voltage in the network is unstable, there is no overvoltage protection
Solution
Installed a voltage relay in the panel, configured the trip thresholds, checked operation
Сетка Плиссе
Laying cable to the outdoor meter
690 som
2 year warranty
Problem
The meter is moved to the facade, the old cable is damaged and does not reach the device
Diagnostics
The cable has mechanical damage and signs of overheating; the section needs to be replaced
Solution
Laid a new cable to the meter, connected it to the terminals, sealed it

Installation of electricity meters in Bishkek from Eco-Service: single-phase and three-phase, replacement, relocation and sealing with a 2-year warranty

What installation and replacement work on meters does Eco-Service perform

From installing a single-phase device in an apartment to assembling a turnkey metering panel in the private sector — the full range of electricity metering work is performed by our in-house crew. Below is what each area includes and which technical details matter before work begins.

Installation of a single-phase and three-phase electricity meter

We install single-phase devices for apartments and standard houses, and three-phase ones for facilities with electric stoves, boilers and machine tools. Work on 220 V takes the crew 1-2 hours: mounting on a DIN rail in a box, connecting the incoming cable, checking the circuit under load. For a three-phase 380 V supply the work takes longer — the technician balances the phases, checks the phase sequence and connects the neutral with grounding to separate terminals. Three-phase models are installed in houses with electric boilers from 6 kW and in workshops with motors. Before installation, the technician checks the actual load and the number of phases at the supply — if a three-phase device is specified but the supply is single-phase, changing the circuit will require separate approval from the power supply organization.

Replacement of a single-phase and three-phase meter

We perform replacement of a single-phase and three-phase meter with dismantling of the old device, installation of a new one and preparation for sealing. The reasons for replacement are usually an expired verification interval, mechanical damage to the housing or a switch to multi-tariff metering — in each case the technician checks the old device's readings against the report and records them before removal. The terminal block of the new meter is tightened with a torque screwdriver: a loose contact at the supply heats up and melts the box housing within a month. The old device is dismantled only after switching off the incoming circuit breaker and verifying the absence of voltage with a tester. Changing the meter "head-on" without removing the load is not allowed — the technician first de-energizes the supply, then dismantles the device, otherwise there is a risk of damaging the terminals and leaving the facility without metering during the paperwork.

Meter relocation and installation on a pole

We relocate the electricity meter within the plot and mount the device on a pole — a standard solution for the private sector of Bishkek and the suburbs. When relocating inside the house, the technician extends the incoming cable and moves the box to a new point, preserving the connection route to the load. Pole mounting is done at a height of 1.6-1.8 m from the ground: the device is placed in a sealed box with IP54 protection rating so that moisture and dust do not reach the terminals. Laying the cable to the meter through the air is done with self-supporting SIP cable with a cross-section of 16 mm² — it withstands wind load and requires no additional insulation. When moving the meter to a pole, it is important to determine in advance the entry point into the house and the cable length — this determines whether a separate cable run to the meter is needed or the existing route will suffice.

Turnkey assembly of a metering panel

  • Housing: a metal or plastic box with a DIN rail, the protection rating is selected for the installation location — IP41 for an apartment, IP54 for outdoors.
  • Metering device: a single-phase or three-phase meter fixed on the rail with access to the terminal block for sealing.
  • Protection: an incoming circuit breaker rated for the load, a 30 mA RCD and a voltage relay that cuts power during surges above 265 V.
  • Wiring: copper jumpers between the circuit breakers, tightening of contacts and marking of groups — according to the diagram agreed with the owner.
  • Electricity meter installation: connection to the load, checking the circuit under current and preparing the panel for the inspector's visit.

How electricity meter installation works: stages of the job

Electricity meter installation follows a sequence: request, technician visit, cable routing, connection to the load, circuit check, terminal tightening, and preparation for sealing. Each stage is recorded in a report, so the owner has a record of all the work.

Routing and connecting the cable to the meter

We route the cable to the device and connect it to the terminals — the cross-section is selected for the actual load and the type of service entrance. For a single-phase line of 5-7 kW, 6 mm² copper is sufficient; for a three-phase 15 kW service entrance, 10 mm² or more is needed; and for an outdoor service entrance, a cable with double insulation and a UV-resistant sheath is used. The run is laid along the wall or in corrugated conduit, entering the panel through a gland so the sheath is not rubbed through on a sharp edge. If the cable is already installed, the technician checks its condition and, if necessary, replaces the service-entrance cable — old outdoor insulation often does not survive reconnection.

Connecting the meter to the load and checking the circuit

We connect the device to the load and check the connection circuit — we verify the phase sequence, the metering direction, and operation under load. The technician runs the phase and neutral conductors through the terminals according to the manufacturer's diagram, separately checks the neutral terminal and the grounding loop, then applies a load from household appliances and watches whether the disc spins or the indicator blinks in the right direction. In search, clients often type electricity meter installation Bishkek — and land on this page, which describes the entire procedure. Checking the circuit is mandatory before sealing: if a connection error is discovered after sealing, the device will have to be opened through the energy supply organization.

Tightening terminals and preparing for sealing

We tighten the meter terminals after installation and prepare the device for sealing — tightening the terminals under load prevents heating and burning. A torque wrench provides the required force on the terminal block screws, and the breakers and busbars in the panel are tightened before the cover is installed, so the seal does not have to be removed later. On a three-phase device, the terminal block is wider and the screws seat unevenly: the technician tightens them in a cross pattern in two passes, monitoring the torque separately on each pair. Tightening should be repeated after several months of operation — under load the terminals settle, and a loose connection becomes a cause of false breaker tripping.

Timelines and procedure

  • Request: the technician clarifies the address, type of service entrance, number of phases, and whether a cable run is ready — this determines the set of tools for the visit.
  • Visit: the specialist arrives with the device, cable, breakers, and fasteners so as not to return for parts twice.
  • Installation: electricity meter installation in Bishkek with a prepared panel takes one visit, while assembling a metering panel from scratch takes a working day.
  • Documents: after the work, the technician draws up a work completion report and submits the data for sealing to the energy supply organization.

Single-phase or three-phase, standard or multi-tariff: which meter to choose

The choice of metering device depends on the number of phases at the input, the nature of the load, and the willingness to save by tariff zones. We break down how these parameters determine the model and what actually affects the final bill.

How single-phase and three-phase devices differ

Parameter Single-phase Three-phase
Number of wires One phase, one neutral Three phase, one neutral
Typical load Lighting, sockets, household appliances Electric stove, boiler, machine tool, pump
Facility power Up to 10 kW From 10 kW and above
Application Apartments, small houses Houses, workshops, facilities with 380 V

The type of device is determined by the actual input to the facility, not by the owner's wish: installing a three-phase meter on a single-phase line is technically pointless — it will not measure on the two missing phases. Installation of a single-phase electricity meter is suitable for an apartment with a gas stove, a three-phase one — for a house with an electric boiler or welding machine. Before purchasing, verify the input type according to the project or the act of the energy supply organization.

Accuracy class and multi-tariff models

For household metering, a device with an accuracy class corresponding to the requirements of the energy supply organization is suitable, and a multi-tariff model allows you to pay by time-of-day zones. The accuracy class denotes the permissible measurement error: for household devices this is usually 1.0 or 2.0, for modern electronic ones — 0.5S. A multi-tariff meter keeps separate records by zones — night, semi-peak and peak — while a smart meter additionally transmits readings via GSM or PLC without a controller's visit. Savings from a multi-tariff device appear only when the main load is shifted to night hours: if the washing machine, boiler and car charging operate during the day, the overpayment for such a meter does not pay off. In our practice, payback comes from shifting at least the boiler and laundry to the night.

What is included in the installation kit

  • Meter box: protects the device from moisture, dust and mechanical damage, selected according to the model's dimensions and the installation method — on a wall or on a support.
  • Input circuit breaker: disconnects the line entirely in case of overload or short circuit, the rating is calculated based on the total power of the facility.
  • RCD: trips on current leakage and protects a person from electric shock when insulation breaks down to the device's casing.
  • Voltage relay: cuts off power when network parameters go beyond permissible limits, and after stabilization returns it automatically.
  • Cable: the cross-section is selected for the current load and the length of the route from the input to the metering panel; installation of electricity meters in Bishkek includes its laying and connection.

Eco-Service equips the installation with a box, input circuit breaker, RCD and voltage relay — the composition is selected for the facility and agreed upon before the visit. The voltage relay is especially relevant for the private sector: surges in the network damage both the metering device and household appliances, and protection costs less than replacing equipment.

Legalization: documents, approval and sealing after installation

Installing the device is only half the job: the meter must be legally brought into account through the power supply organization. We break down who is authorized to install the device, which documents are drawn up, and how sealing is carried out.

Who has the right to install and replace the meter

Installation and replacement of the device is performed by an organization with the appropriate permit, and Eco-Service operates as a direct provider of the service — the work is carried out by its own crew with the paperwork handled. Metering in Bishkek is managed by OJSC "Severelectro": the organization issues technical specifications, accepts the installed device and places it on the subscriber's balance sheet, and without an approval certificate from it the meter legally does not exist — readings are not accepted, and charges are calculated according to the norm. The technical specifications fix the device type, accuracy class, installation location and connection diagram; deviation from them is a frequent reason for rejection during acceptance. Self-installation without a permit creates a problem not at the stage of work, but at sealing: the power supply organization has the right not to accept a device installed without compliance with the requirements. Before calling the crew, request the current technical specifications for your address from "Severelectro" — they determine which model and diagram will be approved on the first try, and plan the installation of the electricity meter, the price of which depends on the scope of work, around the acceptance date.

Which documents are drawn up after installation

  • Device passport: factory documentation with the serial number, year of manufacture and accuracy class — it is used to verify the model during acceptance.
  • Work documents: the work completion certificate and warranty card confirm who installed the device and when.
  • Technical specifications: the document issued by "Severelectro" with the agreed connection parameters and installation location.
  • Approval certificate: the document signed by a representative of the power supply organization on putting the device into operation.

Sealing the meter after installation

We prepare the meter for sealing after installation, while the seal itself is applied by a representative of the power supply organization — until then the device is considered not brought into account. Preparation includes tightening the terminals with a torque wrench, checking the circuit under load and closing the terminal cover: a weak contact causes heating and distortion of readings, which is why the inspector returns the device for rework. A "Severelectro" specialist verifies the serial number against the passport, checks the integrity of the housing and factory stickers, after which they apply the seal and draw up the certificate. Before sealing, the integrity of the terminal cover must not be violated and factory stickers must not be removed — this is grounds for rejection of the device during acceptance. Installation of electricity meters with preparation for the inspector's visit is planned in advance: a repeat call due to an unprepared panel delays bringing the meter into account by two weeks or more.

Protection and automation: circuit breaker, RCD, voltage relay

The meter records consumption, but does not protect the network from accidents. Next to the device in the meter panel, an incoming circuit breaker, an RCD and a voltage relay are installed — they cut off the power in case of overload, leakage and surges.

Incoming circuit breaker and automatic switch

We install an incoming circuit breaker at the input and automatic switches on the outgoing lines — they disconnect the section in case of overload and short circuit. The incoming device is installed after the meter and before the distribution lines, while group modules protect individual branches: lighting, sockets, boiler, kitchen line. When installing the electricity meter in the panel, it is immediately marked which module is responsible for which load, so that when it trips it is clear where to look for the cause. The rating of the incoming circuit breaker is selected according to the cross-section of the incoming cable, and not "by eye": an overrated rating will not protect the wire, an underrated one will cut off the power under normal load.

RCD and voltage relay

We install an RCD for protection against current leakage and a voltage relay for disconnection during surges — both devices are placed in the meter panel. The RCD trips at a leakage of 10 to 30 mA and protects a person when touching a bare wire or when insulation breaks down to the body of the appliance. The voltage relay monitors the level in the network and breaks the circuit when the phase value goes beyond the operating range — this saves the refrigerator, boiler and household appliances from burning out during a neutral break. The voltage relay is configured to the trip threshold taking into account the real state of the network in the area — in the private sector of Bishkek and the suburbs, surges occur more often than in new buildings.

Replacing the incoming cable and connecting to the load

We replace the incoming cable when the insulation is worn and connect the meter to the load — from the input to the distribution panel of the facility. Connection to the load is performed after tightening the contacts and checking the circuit: the cable is stripped, the conductors are crimped with ferrules, tightened into the meter terminals with a specified torque. If the input is aluminum and more than two decades old, the insulation crumbles, and the twists heat up under load — such a section is replaced entirely, and not patched meter by meter. An old aluminum input eventually loses contact at the twists — when replacing the meter, it is reasonable to switch to copper cable right away, so as not to return to this in a year.

Why customers order light meter installation from Eco-Service

A direct provider of metering installation services: our own service center, an in-house team of electrical installers, a warranty on the work, and preparation of documents for the energy supply organization. Below is how the service model is structured and what it gives the customer.

Our own service center in Bishkek

Eco-Service operates through its own service center — requests are accepted in person, and a technician travels to the site within the city and nearby suburbs. The in-house team covers the full cycle: light meter installation, panel assembly, tightening contacts, and preparation for sealing. In-person intake is convenient when non-standard work needs to be agreed upon — for example, moving the device onto a pole or assembling a panel for a specific load. During intake, the technician checks the type of input, the number of phases, and the condition of the existing wiring so that the site visit goes without additional ordering of components. For Bishkek addresses and nearby suburbs, the team travels out on the day of request if there is an opening in the schedule.

2-year warranty on installation

A 2-year warranty on installation work — if contact is broken, there is an error in the circuit, or the installed equipment fails, the technician travels out again. The warranty period covers tightening terminals, checking the connection diagram, and the correct operation of the automation in the panel. The warranty applies to the work, not to the device purchased separately — so it is better to agree on the components before installation so that responsibility lies with one party. This simplifies the resolution of disputed situations: there is no need to prove that the cause of the failure is in the installation rather than in the device or components. For multi-tariff models, the correct connection of phase and neutral circuits is recorded separately — an error here distorts the readings.

Payment and contact methods

  • Phone: requests are accepted at the service center number; the technician clarifies the address, type of input, and a convenient time for the visit.
  • Telegram: in the messenger it is convenient to send a photo of the panel and the input cable — these are used to preliminarily estimate the scope of work.
  • Service center in Bishkek: in-person intake for agreeing on non-standard installation, moving the device onto a pole, and panel assembly.
  • Payment: Eco-Service accepts via MBANK, O!Деньги, and Optima Bank — in cash or by transfer after acceptance of the work.

Conclusion

Installing metering devices is a procedure with legal and technical details: from choosing the device to sealing. We have gathered the key takeaways that will help you go through the process without rework and fines.

Main takeaways

  • Device type for the load: a single-phase meter is installed for a standard load, a three-phase one for electric stoves, boilers, and machine tools; an error in selection leads to redoing the panel.
  • Accuracy class not lower than 1.0: for settlements with households, class 1.0 and higher is suitable; multi-tariff models pay for themselves with night consumption of 30% or more of the daily volume.
  • Approval and sealing are mandatory: without the seal of the energy supply organization, readings are not accepted for calculation, and unauthorized connection risks recalculation according to the norm.
  • Automation protects the device: an input circuit breaker, RCD, and voltage relay extend the service life of the meter during grid surges, which are frequent in Bishkek high-rise buildings.
  • Documents are prepared before voltage is supplied: the approval certificate, the device passport, and the connection diagram — without them, sealing is delayed for weeks.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азамат К.
6 окт. 2026
Ordered the installation of an electricity meter in Bishkek, the technician arrived the same day and did everything neatly and quickly. 2-year warranty, very satisfied!
АС
Айгуль С.
2 окт. 2026
They installed an electricity meter in the apartment, the work was done with high quality, the master explained everything. The cost is calculated after diagnostics, but I was satisfied.
БТ
Бакыт Т.
28 сен. 2026
I needed an urgent meter installation, the guys arrived within an hour, installed it in 30 minutes. The price depends on the scope of work, but the result is excellent.
ГМ
Гульнара М.
24 сен. 2026
Ordered the installation of an electricity meter, the technician was polite and did everything cleanly. 2-year warranty, I recommend!
ДА
Данияр А.
20 сен. 2026
They installed a new-model meter, now I pay by actual usage. Satisfied with the work, thank you!
ЖБ
Жанара Б.
12 сен. 2026
I contacted them to replace the old meter with a new one, the master arrived on time, installed it quickly. The price depends on the scope of work, but I am satisfied.
ИС
Ильяс С.
18 авг. 2026
Ordered the installation of an electricity meter in a private house, everything was done professionally. 2-year warranty, I will contact them again.
КЭ
Камила Э.
16 авг. 2026
The technician installed the meter in an hour, very neatly. The cost is calculated after diagnostics, but the result exceeded expectations.
НЖ
Нурлан Ж.
5 авг. 2026
The meter installation went smoothly, the master checked everything and gave advice. Satisfied with the work!
ПК
Перизат К.
22 июл. 2026
I ordered the installation of an electricity meter, they arrived quickly, installed it with high quality. 2-year warranty, thank you!
РИ
Руслан И.
20 июл. 2026
The technician installed the meter in the garage, everything works great. The price depends on the scope of work, but I'm satisfied.
СО
Салтанат О.
30 июн. 2026
They installed an electricity meter in a new building, the master helped with the paperwork. Very satisfied!
ТВ
Тимур В.
3 июн. 2026
I ordered the installation of a meter, the master arrived at a convenient time, did everything quickly and cleanly. 2-year warranty, I recommend.
ЧД
Чолпон Д.
2 июн. 2026
I contacted them for the installation of a meter, the master is polite, explained everything. The cost is calculated after diagnostics, but I was satisfied.
ЭН
Эрмек Н.
1 июн. 2026
The installation of the electricity meter went without problems, the master is a professional. The price depends on the scope of work, but the result is excellent.
ЮП
Юлия П.
30 мая 2026
Ordered the installation of a meter, the technician arrived on time and installed it neatly. 2-year warranty, very satisfied!
ВЛ
Виктор Л.
25 мая 2026
I ordered the installation of electricity meters — they arrived on time, did everything neatly. Satisfied!
АБ
Асхат Б.
22 мая 2026
Quality installation of electricity meters, neat and without unnecessary mess. I will contact them again.
ТН
Тимур Н.
15 мая 2026
I ordered the installation of electricity meters — they arrived on time, did everything neatly. Satisfied!
РД
Руслан Д.
11 мая 2026
Reasonable prices for the installation of electricity meters, no markups. Everything is fair.
СШ
Сергей Ш.
7 мая 2026
A very polite master, explained everything about the installation of electricity meters. I recommend to friends.
АБ
Асхат Б.
5 мая 2026
I called a master for the installation of electricity meters — he arrived the same day, everything works.
АМ
Алия М.
28 апр. 2026
A very polite master, explained everything about the installation of electricity meters. I recommend to friends.
ТН
Тимур Н.
21 апр. 2026
Ordered the installation of electricity meters — they arrived on time and did everything neatly. Satisfied!
ОВ
Олег В.
16 апр. 2026
I contacted them for the installation of electricity meters, they did it quickly and with quality. I recommend.
СК
Сауле К.
27 мар. 2026
Thank you for the installation of electricity meters! The price is fair, the result is excellent.
АФ
Анна Ф.
24 мар. 2026
Reasonable prices for the installation of electricity meters, no markups. Everything is fair.
АБ
Асхат Б.
16 мар. 2026
Reasonable prices for the installation of electricity meters, no markups. Everything is fair.
ЖК
Жанна К.
21 фев. 2026
I contacted them for the installation of electricity meters, they did it quickly and with high quality. I recommend.
АТ
Айгерим Т.
16 фев. 2026
Good work, the technicians know their business. The installation of electricity meters was done conscientiously.
ГС
Гульнара С.
10 фев. 2026
I contacted them for the installation of electricity meters, they did it quickly and with quality. I recommend.
ДЖ
Динара Ж.
2 фев. 2026
Thank you for the installation of electricity meters! The price is fair, the result is excellent.
ОВ
Олег В.
1 фев. 2026
Reasonable prices for the installation of electricity meters, no markups. Everything is fair.
КЕ
Канат Е.
23 янв. 2026
Excellent service! The installation of electricity meters was completed on time, without unnecessary questions.
ИГ
Ирина Г.
16 янв. 2026
I called a master for the installation of electricity meters — he arrived the same day, everything works.
ЖУ
Жанар У.
5 янв. 2026
Thank you for the installation of electricity meters! The price is fair, the result is excellent.

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about installing electricity meters

Answers to the most popular questions from our clients

Installation of a single-phase electricity meter starts from 900 som; the exact amount depends on the condition of the panel and the scope of work. Diagnostics and a site visit are free if you agree to the repair.
Installation of a three-phase electricity meter starts from 2,500 som, and replacement of a three-phase meter starts from 2,900 som. The master gives the final cost after inspection.
Usually the master arrives on the day of the request or the next day, and the installation of the electricity meter itself takes 1–2 hours. We will agree on the exact time by phone.
For the installation of the electricity meter and all work performed, we provide a 2-year warranty. If something goes wrong, we will come and fix it free of charge.
To install an electricity meter, you need a passport and documents for the property, and the metering device itself must be in the registry. We will help you choose a suitable meter for your load.
Yes, relocating an electricity meter starts from 1,900 som, and installing a meter on a pole starts from 3,500 som. The master will assess the route in advance and agree with you on the new location of the device.
Assembly of the metering panel starts from 3,900 som and includes installation of the enclosure, mounting of the meter, circuit breakers and RCD with connection. We tighten all connections and check them under load.
Yes, sealing after installation starts from 850 som and is mandatory for settlements with the power supply organization. The technician will prepare the device for sealing and explain the registration procedure.
Diagnostics is free if you agree to the repair: the technician checks the connection diagram, the condition of the incoming cable and circuit breakers. Checking the connection diagram separately costs from 900 som.
Most often these are burnt contacts, weak tightening and an old incoming cable. Tightening the meter contacts costs from 750 som, replacing the incoming cable — from 900 som.
You can pay for the installation of an electricity meter in cash or by transfer immediately after the work is completed. We fix the price before installation begins; there are no additional payments "after the fact".
Clear access to the panel and the installation site, remove unnecessary items and ensure the power can be switched off. If the meter is being replaced at the request of the power supply organization, prepare the written order.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на