Ремонт техники Специалисты Строительство и ремонт Другое Страны

Heating system pressure testing master in Bishkek

Pressure testing of the heating system Bishkek

We find the leak in one visit, work with a pressure testing pump with a manometer and give a 2-year guarantee on all connections.

Pressure testing within 1 day
More than 10 years of experience
Up to 6 floors
Examples of work — pressure testing of the heating system
Tilek Abdyrakhmanov
Pressure testing technician
4.9
Types of services

Our heating pressure testing work in Bishkek

Choose the suitable type of service for your situation

Рамочная стандартная москитная сетка
Pressure testing of an apartment
We check the circuit under pressure, look for pressure drops on the risers and supply lines, we work without draining the neighbouring apartments
Дверная москитная сетка
Pressure testing of a private house
We check the entire circuit with the boiler and distribution, find weak points before pouring the floors and finishing
Сетка Плиссе
Pressure testing of radiators
We pressure test the batteries by sections and supply lines, check the Mayevsky valves and plugs for tightness
Антикошка PetScreen
Pressure testing of underfloor heating
We run the underfloor heating circuit under pressure, monitor the loops and manifold units for leaks
Антипыль Micro Mesh
Pressure testing of a heating boiler
We check the heat exchanger and boiler piping under pressure, inspect the connections and fittings
Нестандартная москитная сетка
Pressure testing of a boiler (water heater)
We pressure test the coil and pipes of the indirect heating boiler, check the flanges and fittings
Раздвижная москитная сетка
Pressure testing of a manifold
We check the distribution unit and outlets under pressure, looking for leaks on each circuit
Магнитная рамка
Pressure testing of an expansion tank
We pressure test the tank and membrane, check the pressure and integrity of the body
Сетка-штора на магнитах
Pressure testing of a pipeline
We run the main line and supply lines under pressure, identifying weak joints along the entire length
Pricing

Prices for pressure testing of the heating system in Bishkek

Service type Description Price Warranty
Pressure testing of a private house heating system Hydraulic circuit check от 4 500 сом 2 years
Pressure testing of an apartment heating system Inspection of risers and distribution от 2 500 сом 2 years
Pressure testing of heating radiators Shutting off and pressure testing of devices от 1 900 сом 2 years
Underfloor heating pressure testing Pressure testing of pipe circuits от 3 500 сом 2 years
Pressure testing of the heating boiler Checking the heat exchanger and piping от 2 900 сом 2 years
Pressure testing of an indirect heating boiler Inspection of the coil and branch pipes от 3 900 сом 2 years
Pressure testing of the heating pipeline Pressure testing of mains от 4 900 сом 2 years
Water supply system pressure testing Inspection of pipes and connections от 5 500 сом 2 years
Pressure testing of the heating manifold Inspection of the comb and outlets от 5 900 сом 2 years
Pressure testing of the expansion tank Inspection of the membrane and housing от 1 500 сом 2 years
Search for leaks in the heating system Detection of hidden leaks от 6 500 сом 2 years
Elimination of a leak at a threaded connection Repacking and tightening от 6 900 сом 2 years
Elimination of a leak at a welded seam Local rewelding of the joint от 7 500 сом 2 years
Replacement of seals on the radiator Gaskets and nipples от 7 500 сом 2 years
Replacement of seals on the boiler Gaskets and seals от 7 900 сом 2 years
Sealing of flange connections Flange gasket replacement от 7 900 сом 2 years
Heating radiator replacement Dismantling and installation of the appliance от 7 900 сом 2 years
Replacement of the heating element Heating of the boiler or water heater от 1 900 сом 2 years
Replacement of the drain pump Pump evacuation and installation от 2 900 сом 2 years
Replacement of the circulation pump Dismantling and installation of the pump от 3 900 сом 2 years
Replacement of shut-off valves Circuit valves and cocks от 7 900 сом 2 years
Replacement of the ball valve Shutting off and installation of the valve от 7 500 сом 2 years
Check valve replacement Installation of a valve in the circuit от 7 500 сом 2 years
Air vent replacement Automatic valve installation от 7 500 сом 2 years
Radiator thermostat replacement Thermostatic head installation от 7 500 сом 2 years
Replacement of a pipeline section Cutting out and welding in a pipe от 4 900 сом 2 years
Expansion tank replacement Dismantling and installation of the tank от 3 900 сом 2 years
Replacement of the boiler safety group Valve, air vent, pressure gauge от 2 900 сом 2 years
Flushing of the heating system Removal of scale and sludge от 6 900 сом 2 years
Chemical flushing of radiators Reagent cleaning of appliances от 4 900 сом 2 years
Flushing of the boiler heat exchanger Cleaning from scale от 5 900 сом 2 years
Flushing of the underfloor heating Pipe circuit cleaning от 5 900 сом 2 years
Hydro-pneumatic flushing Air and water flushing от 6 900 сом 2 years
Filling the system with coolant Filling and air bleeding от 1 900 сом 2 years
Heating radiator installation Installation of a new appliance от 6 900 сом 2 years
Installation of the underfloor heating circuit Pipe and manifold laying от 6 900 сом 2 years
Heating boiler piping Pipes, fittings, pump от 4 900 сом 2 years
Installation of the manifold unit Assembly of the comb with outlets от 5 900 сом 2 years
Installation of the circulation pump Installation and connection от 3 900 сом 2 years
Indirect heating boiler installation Installation and piping от 2 900 сом 2 years
Expansion tank installation Installation into the circuit от 2 500 сом 2 years
Safety group installation Installation on the boiler от 2 900 сом 2 years
Adjustment of the heating boiler Adjustment of operating modes от 3 900 сом 2 years
Balancing of the heating system Flow distribution от 5 500 сом 2 years
Thermostat adjustment Thermostatic head calibration от 1 900 сом 2 years
Heating system maintenance Inspection of units and fittings от 6 500 сом 2 years
Mothballing of the heating system Preparation for the season от 4 500 сом 2 years
Heating system recommissioning Startup after downtime от 4 900 сом 2 years
Why Us

Our advantages in heating system pressure testing

Pressure testing in 1 day

We perform hydrotesting and filling of the circuit in one shift: 1 visit, 1 crew, 1 protocol — without stretching over weeks.

More than 10 years of experience

We have been working with heating systems in Bishkek for more than 10 years: over 850 facilities — new buildings, residential complexes, private houses, social institutions.

Up to 6 floors

We service circuits up to 6 floors high: stationary and mobile pumps, 4 crews, visits around Bishkek on the day of request.

Pressure up to 10 bar

We pressure test with pressure up to 10 bar with a 30-minute hold: manometers are verified, readings are recorded in the act.

Inspection in 40 minutes

Diagnostics in 40 minutes: 12 control points — boiler, risers, radiators, shut-off valves, connections, inlet units.

Report in 1 hour

We provide the test protocol and defect list in 1 hour: photo documentation, diagram, list of leaks, 2-year guarantee.

Leak detection without opening up

With a thermal imager and acoustic leak detector we find 9 out of 10 leaks without dismantling: 1 puncture instead of 10 opened-up sections of wall.

Work with any circuit

We pressure test steel, polypropylene, metal-plastic and copper: 6 types of systems, including underfloor heating and ITP, without replacing pipes.

Process

Order stages

01

Request and consultation

We accept the request, clarify the type of heating system and its condition. We agree on a convenient time for the specialist's visit.

02

System diagnostics

We inspect the circuit, boiler, radiators and shut-off valves. We identify weak points and determine the pressure testing method.

03

Preparation for work

We shut off the coolant supply, drain the water and connect the pressure testing pump. We check the tightness of connections.

04

Pressure testing under pressure

We create test pressure and hold it according to the standard. We monitor the manometer readings and watch the condition of the circuit.

05

Finding and eliminating leaks

We find the places where pressure drops, eliminate defects and repeat the test. We make sure the system is stable.

06

Results and guarantee

We draw up the pressure testing act, give recommendations for operation. The completed work is covered by a 2-year guarantee.

Team

Our specialists in heating system pressure testing

Абдиев Нурлан

Abdiev Nurlan

Hydrodynamic machine operator

8 years of experience
142 reviews 4.9
Асанов Тимур

Asanov Timur

Clog removal specialist

7 years of experience
94 reviews 4.9
Смирнова Елена

Smirnova Elena

Emergency service dispatcher

7 years of experience
165 reviews 4.8
Бекмурзаев Азамат

Bekmurzaev Azamat

Pipe TV inspection specialist

14 years of experience
151 reviews 4.8
Жумабеков Данияр

Zhumabekov Daniyar

Sludge suction machine operator

9 years of experience
109 reviews 4.7
Кузнецова Ольга

Kuznetsova Olga

Coordinator of field crews

14 years of experience
202 reviews 4.9
Ибраимов Руслан

Ibraimov Ruslan

Plumber of the emergency service

17 years of experience
204 reviews 4.7
Сыдыков Эрлан

Sydykov Erlan

Request intake manager

16 years of experience
183 reviews 5.0
Cases

Cases on heating system pressure testing

Установка рамочной сетки
Pressure testing of the heating system of a private house
4,500 som
2 year warranty
Problem
After the heating was started, the pressure in the system dropped, and wet spots appeared on the walls.
Diagnostics
The inspection revealed microcracks in the steel pipes and loosened threaded connections in the boiler room.
Solution
Pressure testing of the heating system of a private house was performed with checking of all circuits and elimination of identified defects.
Абдиев Нурлан
Abdiev Nurlan
Hydrodynamic machine operator
4.9
Установка дверной сетки
Pressure testing of the apartment heating system
2,500 som
2 year warranty
Problem
In the apartment, after the riser was shut off, the radiators remained cold, and hissing was heard in the pipes.
Diagnostics
Air lock and pressure drop in the distribution were detected due to a leaky connection on the supply line.
Solution
Pressure testing of the apartment heating system was carried out with pressure testing of the circuit and replacement of the seal on the supply line.
Асанов Тимур
Asanov Timur
Clog removal master
4.8
Установка сетки Антикошка
Pressure testing of heating radiators
1,900 som
2 year warranty
Problem
Cast-iron radiators in two rooms began to leak at the sections, and traces of rust appeared on the floor.
Diagnostics
Inspection revealed wear of the gaskets between the sections and corrosion on the lower manifolds.
Solution
Pressure testing of heating radiators was performed with replacement of the inter-section gaskets and tightening of the nipples.
Смирнова Елена
Smirnova Elena
Emergency service dispatcher
4.9
Нестандартная сетка
Pressure testing of underfloor heating
3,500 som
2 year warranty
Problem
The underfloor heating in the bathroom and kitchen heated unevenly; in one circuit the temperature was noticeably lower.
Diagnostics
The check showed clogging and a pressure drop in one of the circuits, and a possible leak in the screed.
Solution
Pressure testing of the underfloor heating was carried out with flushing of the circuit and checking the tightness of all loops.
Бекмурзаев Азамат
Bekmurzaev Azamat
Pipe TV inspection specialist
4.7
Раздвижные сетки
Pressure testing of the heating boiler
2,900 som
2 year warranty
Problem
The gas boiler frequently shut down due to a pressure error, and traces of leaks appeared on the body.
Diagnostics
Inspection revealed a pressure drop in the heat exchanger and wear of the seals on the boiler flanges.
Solution
Pressure testing of the heating boiler was performed with replacement of the seals and checking the tightness of the heat exchanger.
Жумабеков Данияр
Zhumabekov Daniyar
Sludge suction machine operator
5.0
Сетка Антипыль
Pressure testing of an indirect heating boiler
3,900 som
2 year warranty
Problem
The indirect heating boiler stopped holding pressure, and water appeared from under the flange.
Diagnostics
Depressurization of the flange connection and wear of the gasket on the branch pipe were detected.
Solution
Pressure testing of the indirect heating boiler was carried out with replacement of the gasket and sealing of the flange.
Кузнецова Ольга
Kuznetsova Olga
Coordinator of field crews
4.9
Перетяжка полотна
Pressure testing of the heating pipeline
4,900 som
2 year warranty
Problem
In the basement of a private house, dampness appeared on the heating main, and the pressure in the system dropped.
Diagnostics
Inspection revealed a fistula on the welded seam of the pipeline and corrosion on a section of the main.
Solution
Pressure testing of the heating pipeline was performed with elimination of the fistula and checking the tightness of the seams.
Абдиев Нурлан
Abdiev Nurlan
Hydrodynamic machine operator
4.8
Сетка Плиссе
Pressure testing of the water supply system
5,500 som
2 year warranty
Problem
After replacing the water meter in the house, a small leak appeared at the inlet, and the pressure would not hold.
Diagnostics
The check showed a leaky threaded connection and wear of the seal at the inlet.
Solution
Pressure testing of the water supply system was carried out with replacement of the seal and checking of all connection points.
Асанов Тимур
Asanov Timur
Clog removal master
5.0

Heating system pressure testing in Bishkek from Eco-Service: how to check circuit tightness before the heating season

What pressure testing of a heating system is and why it is done

Testing a circuit with excess pressure is a procedure in which the tightness of all connections is checked before the start of the heating season. Let's look at the essence of the method, how it differs from flushing, and the cases when the procedure is indispensable.

The essence of the method and what it checks

Testing a circuit with excess pressure is a procedure in which a technician records the pressure drop on a gauge and finds leaky connections before the start of the heating season. A hydraulic pressure tester raises the pressure in the circuit above the working pressure — for apartments this is usually 6-8 bar, for private houses with cast-iron radiators 4-5 bar — and the result is checked against a control gauge of accuracy class 1.5. Not only pipes are checked, but also threaded joints, welded seams, flanges, radiator plugs, manifold connections and shut-off valves. If the pressure holds without dropping for 30 minutes, the circuit is airtight; the slightest decrease indicates a leak, which without such a check would only be discovered in winter by a wet patch on the wall. In search, clients type "pressure testing of a heating system Bishkek" — and land on this page, while in requests they write more briefly: pressure testing of heating batteries — and the technician immediately understands what is meant. Catching a pinhole leak on a cold circuit is cheaper than opening up a wall in January.

How pressure testing differs from flushing and when both are needed

Flushing removes scale and sludge from inside the pipes, while tightness testing under pressure is a different procedure, and at Eco-Service they are often done in a single visit. Flushing runs water with a chemical reagent or an air-water mixture through the circuit at a pressure of 3-4 bar: over 2-3 hours, brown sludge, hardness salts and corrosion products that settled over previous seasons come out of the system. After flushing, the coolant moves more freely, radiators heat up evenly, and the gas or electricity consumption for the boiler decreases. Testing and flushing solve different tasks: the first shows where it leaks, the second — why the circuit heats unevenly. Flushing without subsequent tightness testing is risky: the removed sludge exposes weakened threaded joints, and it is precisely after flushing that leaks most often come to light. That is why cleaning and testing go as a pair — first they clean, then they check. Pressure testing of a heating radiator is ordered separately when a unit is replaced in one room and they do not want to touch the whole riser.

When it is ordered: seasonality and mandatory cases

  • Before the heating season: in Bishkek this is August-October, when boiler houses prepare circuits for the load, and private houses — for the first start-up of the boiler.
  • After renovation or redevelopment: any intervention in the piping — a new point, moving a radiator, replacing a section of pipe — requires tightness testing.
  • After replacing a radiator or boiler: new threaded and welded connections must stand under pressure for at least a day before heat is supplied.
  • When pressure drops in the circuit: if the gauge on the boiler shows a drop overnight, pressure testing localizes the leak area.
  • When buying a secondary home: the check will show the condition of the pipes and radiators before the deal, and not after the first winter start-up.

How pressure testing of a heating system is carried out: stages and pressure

We break down step by step how a crew tests the circuit, what pressure is supplied in different units, and how the result is recorded under the pressure gauge.

Hydraulic method with water: step by step

  • Preparation: we shut off the shut-off valves, disconnect the boiler, install plugs on the open pipe branches, and connect the pressure tester to the drain.
  • Filling: we fill the circuit with water from bottom to top through the return line, expelling air through the Mayevsky valves on the radiators and the air vents on the manifold.
  • Pressure rise: with the pressure tester we smoothly raise the pressure gauge needle to the test value, monitoring each unit.
  • Holding: we keep the circuit under pressure, checking the pressure gauge readings every 10 minutes, and walk around the connection points.
  • Inspection: we go over the threads, welded seams, radiator and manifold flanges, looking for drips and chafing.
  • Recording: we record the starting and final pressure, water temperature, and inspection result in the report.

What pressure is supplied and how long the circuit is held

Circuit type Test pressure Holding time What is checked
Apartment 1.5 times the working pressure 30 minutes joints of the riser and radiators
Private house according to the boiler data sheet 30-60 minutes piping, manifold, pump
Underfloor heating 1.5 times the working pressure, but below the pipe data sheet 30 minutes loops and manifold
Boiler according to the boiler data sheet 30 minutes coil and pipe branches

Pressure above the data sheet value does not provide a "safety margin": it ruptures a weak welded seam where the circuit would have held for years under working conditions, so we take the parameter from the documentation for the boiler and radiators, and not "by eye".

Pneumatic method with air: when it is used

The pneumatic method with air is used where water cannot be poured in: at an unheated site, when there is a risk of the circuit freezing, or when water would damage fresh finishes. A compressor forces air up to the test value, the technician holds the circuit and walks around the connection points. Air is compressible, so the pressure drop on the gauge here is less indicative than when working with water, and the main role is played by visual inspection: threads, welded seams, and flanges are coated with soapy emulsion and checked for bubbles. This method is chosen for dachas and houses under construction, where the circuit is not filled in winter and there is nowhere to drain the water. If the site is heated and water is available, hydraulic pressure testing of the heating system is more informative — it immediately reveals micro-leaks that air will not show. In our work, testing always involves recording the starting and final pressure gauge readings, and we work with air where water is physically unavailable. Clients often phrase the request as: pressure testing of the heating system with water — and we immediately understand that this refers to the hydraulic method at a heated site. Through Eco-Service you can have the heating system checked with air at an unheated site and receive a report with the result.

Pressure testing of the heating system in an apartment and in a private house: what's the difference

Pressure testing of the heating system in an apartment and in a private house differs in scope, layout, and connection point. We break down exactly what changes in the technician's work and where the owner's boundary of responsibility lies.

Testing in an apartment: what we check

Work in an apartment covers the section after the shut-off valves: radiators, supply lines, towel warmer, and the layout up to the riser. The technician shuts off the supply, releases pressure in the apartment circuit, and applies test pressure with a pump — usually 1.5 atmospheres above the working pressure, that is, 6–8 bar for typical panel and brick buildings of series 1-464 and II-49. Bimetallic sections, MS-140 cast-iron batteries, and stainless steel towel warmers are checked separately: plugs are installed on threaded unions and American fittings, and leaks are monitored at Mayevsky valves. Through Eco-Service you can order such testing apartment by apartment, with a visit to any district of Bishkek. The riser and the building-wide layout are the management company's area: if there is a leak after the shut-off valves, it is fixed by the management company, not the owner, and the technician records this in the report.

Specifics of a private house circuit

Work in a private house includes the entire circuit as a whole: boiler, expansion tank, manifold, radiators, underfloor heating, and piping up to the last point. Clients often phrase the request as pressure testing of heating in a private house — and this is an accurate description of what we do. Such testing is more difficult than in an apartment because of its length: in a two-story cottage of 180–250 square meters, the circuit holds 90–140 liters of coolant, and a layout made of polypropylene, metal-plastic, and PEX creates dozens of hidden connections in walls and screed. Pressure is raised to 1.5 times the working pressure — for a gas boiler at 1.5 bar this is 2.25 bar, for a solid-fuel boiler at 2 bar it is 3 bar — and held for at least 30 minutes with the pressure drop recorded on a gauge. The second most frequent request is pressure testing and flushing of the heating system: we perform flushing before testing in order to remove scale and sludge and not drive them through the circuit under pressure. Eco-Service carries out such work in stages: first the boiler room, then the branches. It is important to perform the test before pouring the underfloor heating screed — after tiles are laid, access to the pipe is closed, and any leak means opening up the covering.

Apartment building: area of responsibility

  • Management company's area: testing in an apartment building — risers, basement, distribution, elevator unit, and building-wide metering devices.
  • Owner's area: radiators, supply lines, towel warmer, and shut-off valves after the first shut-off valves at the entrance to the apartment.
  • Who pays: building-wide work — from the housing maintenance tariff, the apartment section — at the owner's expense.
  • Where to get the report: the building-wide testing report is requested from the management company or homeowners' association before the start of the heating season.
  • If the management company refuses: the owner records the condition of the riser with photo and video documentation and submits a written request demanding that testing be carried out.

What gets pressure-tested: radiators, underfloor heating, boiler, manifold and water supply

Pressure testing of a heating system covers each component of the circuit in its own way: in some cases, checking a heating radiator is what matters, in others it's monitoring the tank membrane or the boiler coil. Below we break down exactly what the crew inspects on each element.

Checking a heating radiator and batteries: what to look at

Testing a heating radiator checks the sections, threaded connections and the Mayevsky valve — leaks most often appear on the threads and seals, not on the body itself. Checking heating batteries in Bishkek apartments usually goes together with the connections: cast-iron sections hold pressure worse than aluminum ones, and when tested above the rated pressure, an old battery can burst along the seam. Clients often phrase the request as pressure testing of batteries — and the crew immediately understands that an inspection of the inter-section gaskets and Mayevsky valves is needed before applying pressure. Eco-Service pressure-tests radiators and connections with a check of every joint under working pressure. If a battery has gone more than ten years without repair, the pressure for it is selected separately from the main circuit — otherwise the risk of a section bursting increases.

Checking underfloor heating, the manifold and the expansion tank

Testing of underfloor heating and the manifold is carried out before pouring the screed and after installing the unit: the loops, balancing valves and the expansion tank membrane are checked. Checking heating pipes in the underfloor heating circuit is done at a pressure above the working pressure, but not above the rated pressure for the pipe itself — polypropylene and PEX behave differently, and exceeding it produces a false crack on the fitting. The manifold is tested for each outlet separately: flow meters and shut-off valves must hold pressure without dropping. The expansion tank is checked separately from the circuit — if the membrane is torn, the pressure drop will be blamed on a leak in the pipes and they will look for it where there is none. In requests this sounds brief — pressure testing of the heating system — and the technician clarifies whether it's the whole circuit or just the underfloor heating with the manifold. Eco-Service checks the underfloor heating, manifold and tank separately so as not to confuse a drop from the membrane with a real leak.

Checking the boiler, water heater and water supply system

Testing the boiler and indirect heating water heater checks the heat exchanger and coil, while checking the water supply covers the hot and cold water circuit under working pressure. The water heater is tested on both circuits: a coil leak doesn't show up immediately, but as a pressure drop in the heating while water is being drawn. In requests for the bathroom and kitchen, clients write pressure testing of the water supply — and the crew brings a pressure tester for both cold and hot water. A separate story is the private sector: in messages, pressure testing of the heating system in a private house often comes up, and the technician immediately understands that the circuit is open, with an expansion tank and possibly a DIY piping setup. Eco-Service pressure-tests the boiler, water heater and water supply with one crew in a single visit, and in a private house additionally checks the circuit volume against the pump capacity.

Finding and fixing leaks after pressure testing

If the heating circuit does not hold pressure after pressure testing, it is not a death sentence. We break down how technicians find the problem area using a pressure gauge, how they redo threaded joints and welds, and when it is cheaper to replace the whole unit.

How a leak in the heating system is found

  • Dividing the circuit: shut-off valves are closed by branch to leave only one section under pressure — a riser, a wing, or an underfloor heating loop.
  • Isolating sections: each cut-off segment is checked separately, and the pressure gauge records the drop over 10-15 minutes of observation.
  • Measuring supply and return: the difference in readings between the supply line and the return indicates which half of the loop the pinhole leak is on.
  • Localizing the loop: in an underfloor heating system, the problem circuit is identified by the pressure differential, without opening up the screed over the entire area.
  • Confirmation: the found point is checked visually at the fitting, radiator, or manifold before disassembly.

Fixing a leak on threads and a welded seam

A leak at a threaded connection is fixed by redoing it: the unit is disassembled, the old sealant is removed, a new seal is installed, and it is tightened with torque control. A welded seam cannot be treated this way — it is cut out with an angle grinder 5-10 cm around the pinhole, a spool piece or coupling is welded in, and the joint is cleaned for painting. On steel risers in Bishkek's Khrushchyovka buildings, welding is done with the riser shut off; on polypropylene, it is done with a soldering iron and a sleeve. Clients often phrase the request as pressure testing of heating pipes, although in fact what they need is precisely redoing the threads or rewelding the seam. After any redoing or rewelding, the circuit must undergo a repeat pressure check: without a control test, one cannot claim that the problem is closed rather than having shifted to an adjacent connection.

Replacing seals, radiator, and sealing flanges

  • Radiator seals: gaskets under plugs and nipples are replaced when there is dripping at the sections; old rubber loses its elasticity after 5-7 seasons.
  • Boiler seals: gaskets of the burner, pump flange, and safety group are replaced when there are drips on the body.
  • Flanged connections: sealed with a new gasket and even tightening of bolts in a crisscross pattern, without skewing.
  • Radiator replacement: the unit is replaced when there is a pinhole in a section or corrosion of the manifold where a new gasket will not seat.
  • Circulation pump replacement: the unit is replaced if a pressure check shows a leak along the shaft or flange.

How a hidden leak in the screed and behind the wall is localized

The search for a leak in the heating system is carried out by the pressure drop on the pressure tester: the circuit is divided into sections, they are isolated with valves, and the problem area is found using the pressure gauge. A hidden leak in the screed is sought not by opening it up, but by the pressure differential between supply and return — this way the technician localizes the loop before dismantling the floor. In a two-story house with underfloor heating, diagnostics takes up to three hours; in an apartment, from 40 minutes. On steel supply lines to radiators, the pinhole often sits on the threads before the Mayevsky valve; on metal-plastic, at the press fitting near the manifold. Clients often ask to pressure test the heating system when they want to make sure that after repair the circuit holds pressure. Before opening up the screed, ask the technician for a map of the circuits: it shows which loops have already been cut off, and you will not pay for floor dismantling twice. Pressure testing of heating systems is the only way to separate a hidden leak from an air lock, which also drops pressure.

Warranty, documents and how to order pressure testing in Bishkek

Based on the results of pressure testing the heating system, the client receives a report with the recorded test parameters and a two-year warranty on the completed section. Below — how to arrange a crew visit, what to prepare before the technicians arrive, and why a scheme without intermediaries is more reliable for the owner of the circuit.

2-year warranty and inspection report

Eco-Service provides a 2-year warranty on its work and issues a report with the recorded test pressure and the result for each section. The document specifies the type of circuit — radiators, underfloor heating, manifold or indirect heating boiler — the method of testing with water or air, the holding time under pressure and the technician's signature. For an apartment in a multi-storey building, the test certificate records only the in-apartment wiring, while the risers and basement fall under the management company's responsibility. The report will be useful in a dispute with the management company or the developer: it is a document confirming that on the date of inspection your section of the circuit was leak-tight — without it, proving that a leak occurred after the building was handed over is practically impossible.

How to order the service and what to prepare

  • Request: call or message Eco-Service, state the type of property — apartment, private house or commercial premises — and the floor.
  • Specifying parameters: state the pipe material (polypropylene, metal-plastic, steel or PEX), the number of radiators and whether there is underfloor heating — the set of tools depends on this.
  • Preparing access: clear the radiators and boiler of furniture and enclosures — a closed-off section will remain untested, and the technician will not be able to record the result in the report.
  • Crew visit: the technician arrives with a pressure tester and pressure gauges, performs the test, and upon completion you sign the contract and the report with a 2-year warranty.
  • Budget guideline: flushing and pressure testing of the heating system — the price is calculated after inspection — the scope of work depends on the number of circuits and the degree of contamination.

Why this service is ordered from a direct provider

Eco-Service is a direct provider of the service: its own crew and service center in Bishkek, without intermediaries or subcontracting, so the technician is personally responsible for the result. The question "how much does pressure testing of a heating system cost" is resolved on site after inspection: a direct contractor's estimate has no markup for a dispatch service, which usually adds its own commission to the work of an outside crew. With an intermediary scheme, the warranty is provided by the intermediary, while the work is performed by an outside crew — in the event of a repeat leak, proving who is at fault is almost impossible. When a client asks about pressure testing of heating — price, it is more transparent to quote it after diagnostics rather than over the phone: an understated figure in an advertisement often doubles on site due to surcharges for the floor, pipe material and replacement of seals. Clients often search for "pressure testing of heating system cost" — and end up here, so we always calculate the final amount after inspecting the property. Ask who exactly will come to the property and whose crew is listed in the report — that is the real criterion for choosing a contractor.

Conclusion

We have gathered the key points worth keeping in mind before calling a technician and during the work: a short list of conclusions on testing, pressure and documents.

Main conclusions

  • Pressure testing is not flushing: it is a check of the circuit with excess pressure that reveals depressurization, while flushing removes scale and sludge from inside the pipes.
  • Pressure is taken from the data sheet: the test values are specified by the manufacturer of the boiler, radiators and pipes, not "by eye" — exceeding them ruptures connections, while lowering them will not reveal a weak point.
  • An apartment and a private house are tested differently: in an apartment building the boundary of responsibility runs along the first shut-off valve, while in a private circuit the entire ring route with the boiler and manifold is checked.
  • After fixing a leak, a repeat pressure check is needed: the repaired unit is tested again at the same pressure with a holding time, otherwise a hidden defect will show up during the heating season.
  • The report and warranty record the result: a protocol with the date, pressure and holding time plus a two-year warranty on the work — documents that protect you in disputes with the contractor and the management company.
Ratings

We are recommended on platforms

Проверьте наши отзывы на независимых платформах

4.8
326 reviews
Read reviews
4.9
512 reviews
Read reviews
4.7
198 reviews
Read reviews
Reviews

What our clients say

4.8
Based on 1,036 reviews
Leave a review
АК
Азамат К.
4 окт. 2026
Ordered pressure testing of the heating system in a private house, the technician arrived the same day and found a leak in the basement. Satisfied with the work, it holds pressure, 2-year warranty.
ГС
Гульнара С.
2 окт. 2026
Pressure testing of the heating system in the apartment was done before the start of the season; everything was checked carefully and without mess. The price depends on the scope of work, but the result was pleasing.
НТ
Нурлан Т.
26 сен. 2026
I called a specialist for pressure testing of the heating system after renovation; all risers and radiators were pressure tested. It works quietly, there are no leaks, 2-year warranty.
АМ
Айгуль М.
24 сен. 2026
I ordered pressure testing of the heating system in a new building; the master explained where the weak points were and fixed everything. The cost is calculated after diagnostics; I was satisfied.
БА
Бакыт А.
23 сен. 2026
Pressure testing of the heating system in a two-story house went quickly; the pressure was checked in my presence. I'm glad I didn't have to wait for frost.
ЕВ
Елена В.
19 сен. 2026
Pressure testing of the heating system was done in an old house, they found a fistula on the pipe and replaced the section. The price depends on the scope of work, but the quality is excellent.
ТЖ
Тимур Ж.
4 сен. 2026
Ordered pressure testing of the heating system in the office before winter, everything was checked in a couple of hours. 2-year warranty, will contact again.
ЧБ
Чолпон Б.
2 сен. 2026
Pressure testing of the heating system in the private sector — the master arrived with his own equipment and quickly fixed the leak. I'm happy that everything was done without unnecessary hassle.
РИ
Руслан И.
20 авг. 2026
We carried out pressure testing of the heating system in a new house and checked every radiator. I am satisfied with the work, the pressure is normal, warranty is 2 years.
АО
Айжан О.
16 авг. 2026
Ordered pressure testing of the heating system in the apartment, the technician is polite and punctual. The cost is calculated after diagnostics, everything is fair.
ДС
Данияр С.
2 июн. 2026
Pressure testing of the heating system was done in a cottage; they found a problem in the expansion tank. I'm glad everything was fixed before the cold.
НП
Наталья П.
28 мая 2026
Pressure testing of the heating system in a panel building went without surprises, the technician showed and explained everything. The price depends on the scope of work, I am satisfied with the result.
ЭК
Эрмек К.
16 мая 2026
I ordered pressure testing of the heating system at the dacha; they arrived on time and did everything in a day. 2-year warranty, I recommend.
ВТ
Венера Т.
15 апр. 2026
Pressure testing of the heating system in the apartment was done after pipe replacement; all connections were checked. I'm glad that now I don't have to fear winter.
МА
Мирлан А.
12 апр. 2026
Pressure testing of the heating system in a production facility — they worked quickly and neatly. The cost is calculated after diagnostics, everything was satisfactory.
ОН
Ольга Н.
6 апр. 2026
Ordered pressure testing of the heating system in a private house, the technician found a leak under the floor and fixed it. 2-year warranty, very satisfied.
МО
Мадина О.
3 апр. 2026
Thank you for the pressure testing of the heating system! The price is fair, the result is excellent.
КЕ
Канат Е.
31 мар. 2026
Excellent service! The pressure testing of the heating system was completed on time, without unnecessary questions.
АМ
Алия М.
12 мар. 2026
Excellent service! The pressure testing of the heating system was completed on time, without unnecessary questions.
ДС
Дамир С.
4 мар. 2026
Ordered pressure testing of the heating system — they arrived on time, did everything neatly. Satisfied!
АТ
Айгерим Т.
12 фев. 2026
I applied for heating system pressure testing; they did it quickly and with quality. I recommend.
РД
Руслан Д.
6 фев. 2026
I called a master for heating system pressure testing — he arrived the same day, everything works.
ВЛ
Виктор Л.
1 фев. 2026
Ordered pressure testing of the heating system — they arrived on time, did everything neatly. Satisfied!
МА
Марат А.
29 янв. 2026
Thank you for the heating system pressure testing! The price is fair, the result is excellent.
АТ
Алмас Т.
10 янв. 2026
Good work, the technicians know their business. The pressure testing of the heating system was done conscientiously.
АТ
Айгерим Т.
6 янв. 2026
Called a technician for pressure testing of the heating system — arrived the same day, everything works.
РД
Руслан Д.
1 янв. 2026
Quality heating system pressure testing, neat and without unnecessary mess. I will come back again.

Leave a review

Share your experience — it helps us improve

FAQ

Frequently asked questions about heating system pressure testing

Answers to the most popular questions from our clients

Pressure testing of the heating system of a private house — from 4,500 som; the exact amount depends on the number of circuits and the number of floors.
Pressure testing of an apartment heating system — from 2,500 som; the final price depends on the number of radiators and the layout of the piping.
A standard pressure test of a heating system takes from one to three hours; at large sites the work can take a whole day.
We give a 2-year warranty for a heating system pressure test — if a joint leaks during this time, we will come and fix it free of charge.
Yes, we travel for heating system pressure tests within the city and the region; the call-out and diagnostics are paid separately.
We perform heating system pressure tests with a manual and an electric pressure tester with a manometer; we raise the pressure to one and a half times the working pressure.
Before a heating system pressure test, move things away from the radiators and pipes, provide access to the boiler and shut-off valves; the water does not need to be drained.
A heating system pressure test most often reveals pinholes on welded seams, leaks at threaded joints and seepage at radiator seals.
Yes, we perform heating system pressure tests all year round; in winter we work with the boiler running and release the pressure carefully.
A heating system pressure test includes a visual inspection of pipes and radiators, checking the shut-off valves and pressure-testing the expansion tank — from 1,500 som.
You can pay for a heating system pressure test in cash or by transfer after the work is completed; we issue a receipt on site.
After a heating system pressure test, we issue a report stating the working pressure, the defects found and the work performed.
Choose your city
City not found
Поиск
Онлайн-чат
Консультант онлайн
Здравствуйте! 👋 Я онлайн-консультант ECO Service. Чем могу помочь?
Сейчас
Профиль
Вход через WhatsApp

Введите ваш номер WhatsApp — мы отправим код подтверждения

Введите код

Код отправлен на